Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10099
Well Classification: GW Status: PR - 11/28/2004
Well Name/No:FEDERAL #RWF 323-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/28/2004
FacilityID:272558LocationID:335433
County:GARFIELD #045Location:NESW 19 6S94W 6
Field:RULISON - #75400Elevation:5639 ft.
Basin:PICEANCE BASIN  
Planned Location:1604FSL  1593 FWLLat/Long: 39.507549 / -107.932611Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.507610 / -107.932594Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/28/2004             Measured TD: 8215 ft.    Vertical TD: 8156 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/28/2004
Wellbore PermitDIRECTIONAL
Permit #:20041108 Expiration Date:6/7/2005
Proposed Top PZ Location:Sec: Twp: Footage: 2376 FSL  1441 FWL
Bottom Hole Location:Sec: Twp: Footage: 2376 FSL  1441 FWL
Proposed Depth/Form:8250 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:10/15/2004
Spud Date:9/9/2004Spud Date Is:ACTUAL
Measured TD:8215 ft.Measured PB depth:8169 ft.
True Vertical TD:8156 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2376 FSL  1441 FWL
Bottom Hole Location:Sec: Twp: Footage: 2376 FSL  1441 FWL
Log Types:HIGH RESOLUTION IND SPECTRAL DEN DUAL SPACED NEU.,CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1126 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1126 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8203 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1080, Top: 4100 ft., Bottom: 8203 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2312 ft.NN
MESAVERDE4753 ft.NN
CAMEO7322 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/28/2004                Interval Top: 5930 ft.    Interval Bottom: 8129 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:10/15/2004
Treatment Summary:4000 GALS 7 1/2% HCL, 542340# 30/50, 13850 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:7505 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/28/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1709
CASING_PRESS 1953
MCF_GAS 1709
TUBING_PRESS 1763
Perforation Data:
Interval Top:5930 ft.# Of Holes:92
Interval Bottom:8129 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)29
Total Gas Produced (MCF)16373
GOR564586
GOR DeterminationMCFE
Average BOE per Day7.812
Average MCFE per Day45.322

 Federal Financial Assurance  i Y

 Tribal Well  i No