Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09967
Well Classification: GW Status: PR - 7/7/2004
Well Name/No:WILLIAMS #GM 216-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/7/2004
FacilityID:271847LocationID:335364
County:GARFIELD #045Location:NWNE 33 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5409 ft.
Basin:PICEANCE BASIN  
Planned Location:728FNL  2085 FELLat/Long: 39.485718 / -108.111446Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.485951 / -108.111398Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/7/2004             Measured TD: 6646 ft.    Vertical TD: 6631 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/7/2004
Wellbore PermitDIRECTIONAL
Permit #:20040638 Expiration Date:4/7/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1043 FNL  1978 FEL
Bottom Hole Location:Sec: Twp: Footage: 1043 FNL  1978 FEL
Proposed Depth/Form:6594 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: NE/4

Wellbore Completed
Completion Date:5/29/2004
Spud Date:5/12/2004Spud Date Is:ACTUAL
Measured TD:6646 ft.Measured PB depth:6500 ft.
True Vertical TD:6631 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1043 FNL  1978 FEL
Bottom Hole Location:Sec: Twp: Footage: 1043 FNL  1978 FEL
Log Types:FRESERVOIR PERFORMANCE MONITOR, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1148 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 515, Top: 0 ft., Bottom: 1147 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6622 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 2154 ft., Bottom: 6621 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT UNION2079 ft.NN
MESAVERDE3447 ft.NN
CAMEO5946 ft.NN
ROLLINS6411 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/7/2004                  Interval Top: 4638 ft.    Interval Bottom: 6381 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/29/2004
Treatment Summary:SEE OGCC COMMENTS
Tubing Size:2.375 in.Tubing Setting Depth:5986 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/7/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 154000
CALC_MCF_GAS 1540
CASING_PRESS 845
MCF_GAS 1540
TUBING_PRESS 717
Perforation Data:
Interval Top:4638 ft.# Of Holes:72
Interval Bottom:6381 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)7170
GOR651818
GOR DeterminationMCFE
Average BOE per Day3.420
Average MCFE per Day19.831

 Federal Financial Assurance  i 

 Tribal Well  i No