Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09944
Well Classification: OW Status: PR - 7/28/2004
Well Name/No:FEDERAL #GM 441-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC49043
Facility Status:PRStatus Date7/28/2004
FacilityID:271758LocationID:334794
County:GARFIELD #045Location:NENE 8 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6053 ft.
Basin:PICEANCE BASIN  
Planned Location:257FNL  443 FELLat/Long: 39.458249 / -108.123947Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.458323 / -108.123501Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/28/2004             Measured TD: 6738 ft.    Vertical TD: 6668 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/28/2004
Wellbore PermitDIRECTIONAL
Permit #:20040547 Expiration Date:3/30/2005
Proposed Top PZ Location:Sec: Twp: Footage: 860 FNL  885 FEL
Bottom Hole Location:Sec: Twp: Footage: 860 FNL  885 FEL
Proposed Depth/Form:6575 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:7/1/2004
Spud Date:5/21/2004Spud Date Is:ACTUAL
Measured TD:6738 ft.Measured PB depth:6738 ft.
True Vertical TD:6668 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 860 FNL  885 FEL
Bottom Hole Location:Sec: Twp: Footage: 860 FNL  885 FEL
Log Types:HIGH RESOLUTION SPECTRAL DEN.DUAL SPACED NEU..CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1126 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1126 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6658 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 4230 ft., Bottom: 6658 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2082 ft.NN
FORT UNION2381 ft.NN
MESAVERDE3546 ft.NN
CAMEO6034 ft.NN
ROLLINS6498 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 7/28/2004                 Interval Top: 4913 ft.    Interval Bottom: 6421 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/1/2004
Treatment Summary:1000 GALS 7 1/2% HCL, 169428# 20/40, 3887 BBLS SLICK WATER // 750 GALS 7 1/2% HCL, 120273# 20/40, 2785 BBLS SLICK WATER.
Tubing Size:2.375 in.Tubing Setting Depth:6204 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/28/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1275
CASING_PRESS 940
MCF_GAS 1275
TUBING_PRESS 1212
Perforation Data:
Interval Top:4913 ft.# Of Holes:76
Interval Bottom:6421 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)44
Total Gas Produced (MCF)33757
GOR767204
GOR DeterminationMCFE
Average BOE per Day16.069
Average MCFE per Day93.181

 Federal Financial Assurance  i Y

 Tribal Well  i No