Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09941
Well Classification: GW Status: PR - 8/1/2012
Well Name/No:CLOUGH #RWF 433-18
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62724
Facility Status:PRStatus Date8/1/2012
FacilityID:271710LocationID:335133
County:GARFIELD #045Location:NWSE 18 6S94W 6
Field:RULISON - #75400Elevation:5907 ft.
Basin:PICEANCE BASIN  
Planned Location:2213FSL  2411 FELLat/Long: 39.523669 / -107.929881Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.523726 / -107.929874Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2012             Measured TD: 8642 ft.    Vertical TD: 8600 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2012
Wellbore PermitDIRECTIONAL
Permit #:20040528 Expiration Date:3/25/2005
Proposed Top PZ Location:Sec: Twp: Footage: 2320 FSL  1889 FEL
Bottom Hole Location:Sec: Twp: Footage: 2320 FSL  1889 FEL
Proposed Depth/Form:8520 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:N/A
Spud Date:4/17/2004Spud Date Is:ACTUAL
Measured TD:8642 ft.Measured PB depth:8520 ft.
True Vertical TD:8600 ft.True Vertical PB depth:8478 ft.
Top PZ Location:Sec:18 Twp: 6S 94WFootage: 2337 FSL  1865 FEL
Bottom Hole Location:Sec:18 Twp: 6S 94WFootage: 2304 FSL  1862 FEL
Log Types:RESERVOIR MONITOR TOOL ELITE,CHI PROCESSED TRIPLE COMBO,CBL
Log Types:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1106 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 515, Top: 0 ft., Bottom: 1106 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8634 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1100, Top: 5334 ft., Bottom: 8634 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 5334 ft., Depth: 6346 ft., Bottom: 8634 ft., Sacks: 150, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
WASATCH G1735 ft.NN
MESAVERDE4123 ft.NN
CAMEO6771 ft.NN
ROLLINS7683 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/1/2012                  Interval Top: 6724 ft.    Interval Bottom: 8512 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/20/2004
Treatment Summary:TREATED WITH 4250 GALS 7-1/2% HCL, 587989# 20/40 MESH; 14011 BBLS SLICKWATER
Tubing Size:2.6 in.Tubing Setting Depth:8224 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 187600
CALC_MCF_GAS 1876
CASING_PRESS 1785
MCF_GAS 1876
TUBING_PRESS 1435
Perforation Data:
Interval Top:6724 ft.# Of Holes:71
Interval Bottom:8512 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)33
Total Gas Produced (MCF)12875
GOR390151
GOR DeterminationMCFE
Average BOE per Day6.173
Average MCFE per Day35.801

 Federal Financial Assurance  i 

 Tribal Well  i No