Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09569
Well Classification: GW Status: PR - 7/1/2024
Well Name/No:PA #331-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2024
FacilityID:270610LocationID:334920
County:GARFIELD #045Location:NWNE 6 7S95W 6
Field:PARACHUTE - #67350Elevation:5202 ft.
Basin:PICEANCE BASIN  
Planned Location:446FNL  1969 FELLat/Long: 39.472819 / -108.038054Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.472676 / -108.038078Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2024             Measured TD: 6551 ft.    Vertical TD: 6498 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20032467 Expiration Date:12/28/2004
Proposed Top PZ Location:Sec: Twp: Footage: 530 FNL  1836 FEL
Bottom Hole Location:Sec: Twp: Footage: 530 FNL  1836 FEL
Proposed Depth/Form:6655 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: NE/4

Wellbore Completed
Completion Date:6/19/2004
Spud Date:5/11/2004Spud Date Is:ACTUAL
Measured TD:6551 ft.Measured PB depth:6498 ft.
True Vertical TD:6498 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 530 FNL  1836 FEL
Bottom Hole Location:Sec: Twp: Footage: 530 FNL  1836 FEL
Log Types:HIGH RESOLUTION IND.SPECTRAL DEN.DUAL SPACED NEU,CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 710 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 710 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6537 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 2404 ft., Bottom: 6537 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1455 ft.NN
FORT UNION1761 ft.NN
MESAVERDE3457 ft.NN
CAMEO5992 ft.NN
ROLLINS6545 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/1/2024                  Interval Top: 4679 ft.    Interval Bottom: 6360 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/19/2004
Treatment Summary:TREATED WITH 385544# 30/50 SAND, 8809 BBLS SLICKWATER, 2500 GALS 7.5% HCL
Tubing Size:2.375 in.Tubing Setting Depth:5909 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/12/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 141200
CALC_MCF_GAS 1412
CASING_PRESS 1540
MCF_GAS 1412
TUBING_PRESS 1476
Perforation Data:
Interval Top:4679 ft.# Of Holes:53
Interval Bottom:6360 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)6860
GOR623636
GOR DeterminationMCFE
Average BOE per Day3.274
Average MCFE per Day18.990

 Federal Financial Assurance  i 

 Tribal Well  i No