Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09458
Well Classification: GW Status: PR - 4/18/2004
Well Name/No:PA #531-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/18/2004
FacilityID:270119LocationID:335333
County:GARFIELD #045Location:NWNE 34 6S95W 6
Field:PARACHUTE - #67350Elevation:5442 ft.
Basin:PICEANCE BASIN  
Planned Location:404FNL  2224 FELLat/Long: 39.487239 / -107.983223Lat/Long Source: Calculated From Footages
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/18/2004             Measured TD: 7680 ft.    Vertical TD: 7618 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/18/2004
Wellbore PermitDIRECTIONAL
Permit #:20032112 Expiration Date:11/18/2004
Proposed Top PZ Location:Sec: Twp: Footage: 977 FNL  2004 FEL
Bottom Hole Location:Sec: Twp: Footage: 636 FNL  2122 FEL
Proposed Depth/Form:7605 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:3/4/2004
Spud Date:12/31/2003Spud Date Is:ACTUAL
Measured TD:7680 ft.Measured PB depth:7628 ft.
True Vertical TD:7618 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 977 FNL  2004 FEL
Bottom Hole Location:Sec: Twp: Footage: 636 FNL  2122 FEL
Log Types:RESERVOIR MONITOR TOOL ELITE, ULTRSONIC IMAGING TOOL CEMENT EVALUATION (CBL), ACOUSTIC CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2105 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 825, Top: 0 ft., Bottom: 2104 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7669 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 946, Top: 3450 ft., Bottom: 7669 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1865 ft.NN
FORT UNION2185 ft.NN
MESAVERDE4180 ft.NN
CAMEO6858 ft.NN
ROLLINS7592 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/18/2004                 Interval Top: 5602 ft.    Interval Bottom: 7518 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/4/2004
Treatment Summary:1000 GALS 7 1/2% HCI, 96675# 20/40, 1825 BBLS SLICK WATER // 800 GALS 7 1/2% HCL, 153250# 20/40, 3479 BBLS SLICK WATER // 500 GALS 7 /12% HCL, 108486# 20/40, 2134 BBLS SLICK WATER // 1000 GALS 7 1/2% HCL, 100287# 20/40, 1826 BBLS SLICK WATER //500 GALS 7 1/2% HCL, 105981# 20/40, 2025 BBLS SLICK WATER // 1000 GALS 7 1/2% HCI, 84207# 20/40, 1653 BBLS SLICK WATER // 300 GALS 7 1/2% HCI, 83665# 20/40, 1722 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:6924 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/18/2004Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_MCF_GAS 1220
CASING_PRESS 1328
MCF_GAS 1220
TUBING_PRESS 1190
Perforation Data:
Interval Top:5602 ft.# Of Holes:115
Interval Bottom:7518 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)8670
GOR722500
GOR DeterminationMCFE
Average BOE per Day4.132
Average MCFE per Day23.951

 Federal Financial Assurance  i 

 Tribal Well  i No