Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09439
Well Classification: GW Status: PR - 3/1/2019
Well Name/No:CHEVRON/TEXACO #34C-12D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2019
FacilityID:270032LocationID:335774
County:GARFIELD #045Location:SWSE 12 6S97W 6
Field:GRAND VALLEY - #31290Elevation:6811 ft.
Basin:PICEANCE BASIN  
Planned Location:685FSL  1372 FELLat/Long: 39.531937 / -108.164269Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.532060 / -108.164280Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2019             Measured TD: 8052 ft.    Vertical TD: 8016 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2019
Wellbore PermitDIRECTIONAL
Permit #:20032044 Expiration Date:11/4/2004
Proposed Top PZ Location:Sec:12 Twp: 6S 97W Footage: 475 FSL  1996 FEL
Bottom Hole Location:Sec:12 Twp: 6S 97W Footage: 475 FSL  1996 FEL
Proposed Depth/Form:8500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RL-WF , Formation: ROLLINS-WILLIAMS FORK , Order: 318 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/16/2004
Spud Date:3/31/2004Spud Date Is:ACTUAL
Measured TD:8052 ft.Measured PB depth:8016 ft.
True Vertical TD:8016 ft.True Vertical PB depth:7980 ft.
Top PZ Location:Sec:12 Twp: 6S 97WFootage: 475 FSL  1996 FEL
Bottom Hole Location:Sec:12 Twp: 6S 97WFootage: 475 FSL  1996 FEL
Log Types:NEUTRON, GR, DENSITY, INDUCTION, MICROLOG, CBL
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 3230 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 3230 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8016 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 4573 ft., Bottom: 8016 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2970 ft.NN
FORT UNION3440 ft.NN
WILLIAMS FORK4824 ft.NN
CAMEO7356 ft.NN
ROLLINS7840 ft.NN

Formation CMEO                     Formation Classification:  GW                     Status:  CM - 7/31/2004                 Interval Top: 7420 ft.    Interval Bottom: 7486 ft.

 Completed Information for Formation CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/16/2004
Treatment Summary:FRACED WITH 545 BBL OF 22# LIGHTNING GEL; 60,130# 20/40 SAND AND 2000# 14/30 FLEX SAND
Tubing Size:2.375 in.Tubing Setting Depth:7465 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2004Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 1
BTU_GAS 1063
CALC_GOR 579000
CASING_PRESS 2262
GRAVITY_OIL 57
MCF_GAS 579
TUBING_PRESS 1895
Perforation Data:
Interval Top:7420 ft.# Of Holes:10
Interval Bottom:7486 ft.Hole Size:0.34 in.

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 12/30/2004                Interval Top: 6241 ft.    Interval Bottom: 7211 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORKCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/16/2004
Treatment Summary:FRACED WITH 3116 BBL 20# LIGHTNING GEL; 313,427# 20/40 SNAD AND 9800# 14/30 FLEX SAND
Tubing Size:2.375 in.Tubing Setting Depth:7465 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2004Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 1
BTU_GAS 1063
CALC_GOR 579000
CASING_PRESS 2262
GRAVITY_OIL 57
MCF_GAS 579
TUBING_PRESS 1895
Perforation Data:
Interval Top:6241 ft.# Of Holes:42
Interval Bottom:7211 ft.Hole Size:0.34 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/1/2019

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
No Perforation Data was found for formation WFCM.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)18
Total Gas Produced (MCF)11297
GOR627611
GOR DeterminationMCFE
Average BOE per Day5.390
Average MCFE per Day31.240

 Federal Financial Assurance  i 

 Tribal Well  i No