Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09371
Well Classification: GW Status: PR - 10/12/2004
Well Name/No:PUCKETT #12C-17D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/12/2004
FacilityID:269467LocationID:335013
County:GARFIELD #045Location:NWNW 17 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6732 ft.
Basin:PICEANCE BASIN  
Planned Location:952FNL  573 FWLLat/Long: 39.441899 / -108.138487Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.441920 / -108.138610Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/12/2004             Measured TD: 7137 ft.    Vertical TD: 6989 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/12/2004
Wellbore PermitDIRECTIONAL
Permit #:20031570 Expiration Date:9/17/2004
Proposed Top PZ Location:Sec:17 Twp: 7S 96W Footage: 2122 FNL  641 FWL
Bottom Hole Location:Sec:17 Twp: 7S 96W Footage: 2122 FNL  641 FWL
Proposed Depth/Form:7600 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/29/2004
Spud Date:5/11/2004Spud Date Is:ACTUAL
Measured TD:7137 ft.Measured PB depth:7010 ft.
True Vertical TD:6989 ft.True Vertical PB depth:6862 ft.
Top PZ Location:Sec:17 Twp: 7S 96WFootage: 2122 FNL  641 FWL
Bottom Hole Location:Sec:17 Twp: 7S 96WFootage: 2122 FNL  641 FWL
Log Types:TRIPLE LITHO DENSITY, COMPENSATED NEUTRON, ARRAY INDUCTION /LINEAR CORRELATION, GR, MICROLOG, CCL
Log Types:TRIPLE LITHO DENSITY, COMPENTATED NEUTRON, ARRAY INDUCTION & LINEAR CORR. GR, MICROLOG, CCL
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 116 ft., Weight: 44 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 116 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2850 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 2850 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7010 ft., Weight: 9.3 , Citings Type: ACTUAL
Cement:Sacks: 950, Top: 4000 ft., Bottom: 7010 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH2440 ft.NN
WASATCH G2440 ft.NN
FORT UNION2701 ft.NN
WILLIAMS FORK4110 ft.NN
CAMEO6355 ft.NN
ROLLINS6840 ft.NN

Formation CMEO                     Formation Classification:  GW                     Status:  CM - 11/1/2004                 Interval Top: 6421 ft.    Interval Bottom: 6682 ft.

 Completed Information for Formation CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/29/2004
Treatment Summary:09/29/04 BJ SERVICES PERFORMED AN EXPRO FRAC WITH 1659 BBL OF LIGHTING 20# GEL SYSTEM USING 163422# OF 20/40 FRAC SAND AND 4832# OF RESIN COATED MSE 14/30 MESH SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/1/2004Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 1
BTU_GAS 1049
CALC_BBLS_H2O 3
CALC_BBLS_OIL 1
CALC_GOR 605000
CALC_MCF_GAS 605
CASING_PRESS 1809
MCF_GAS 605
Perforation Data:
Interval Top:6421 ft.# Of Holes:360
Interval Bottom:6682 ft.Hole Size:0.34 in.

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 11/1/2004                 Interval Top: 5580 ft.    Interval Bottom: 6321 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORKCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/29/2004
Treatment Summary:09/29/2004 BJ SERVICES PERFORMED AN EXPRO FRAC WITH 3150 BBL OF LIGHTING 20# GEL SYSTEM USING 320245# OF 20/40 FRAC SAND AND 10736# OF RESIN COATED MSE 14/30 MESH SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/1/2004Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 1
BTU_GAS 1049
CALC_BBLS_H2O 3
CALC_BBLS_OIL 1
CALC_GOR 605000
CALC_MCF_GAS 605
CASING_PRESS 1809
MCF_GAS 605
Perforation Data:
Interval Top:5580 ft.# Of Holes:600
Interval Bottom:6321 ft.Hole Size:0.34 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/12/2004

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/1/2004Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
No Perforation Data was found for formation WFCM.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)33118
GOR
GOR DeterminationMCFE
Average BOE per Day15.649
Average MCFE per Day90.781

 Federal Financial Assurance  i 

 Tribal Well  i No