|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 1/1/2026 Measured TD: 8937 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 1/1/2026 | | Wellbore Permit | | | Permit #: | 20031569 | Expiration Date: | 9/17/2004 | | Proposed Depth/Form: | 9400 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 12/2/2004 | | Spud Date: | 9/10/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 8937 ft. | Measured PB depth: | 8907 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED NEUTRON, GAMMA RAY, DIPOLE SONIC, CCL,CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 24 in., Top: 0 ft., Depth: 100 ft., Weight: 44 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2611 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 1000, Top: 0 ft., Bottom: 2611 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8907 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1050, Top: 5450 ft., Bottom: 8907 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4282 ft. | | N | N | | FORT UNION | 4580 ft. | | N | N | | WILLIAMS FORK | 5940 ft. | | N | N | | CAMEO | 8350 ft. | | N | N | | ROLLINS | 8740 ft. | | N | N |
Formation CMEO Formation Classification: GW Status: CM - 1/31/2005 Interval Top: 8358 ft. Interval Bottom: 8470 ft.| Completed Information for Formation CAMEO | | 1st Production Date: | 1/31/2005 | Choke Size: | 0.188 in. | | Formation Name: | CAMEO | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/2/2004 | | Treatment Summary: | 12/2/04 B J SERVICES PERFORMED AN GELLED WATER FRAC WITH 1784 BBL OF LIGHTING 22# GEL SYSTEM USING 166500# OF 20/40 FRAC SAND AND 6000# OF RESIN COATED MSE 14/30 MESH SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8431 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/31/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 0 | | BTU_GAS | 1079 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 1056 | | CASING_PRESS | 1823 | | MCF_GAS | 1056 | | TUBING_PRESS | 1815 |
| | Perforation Data: | | Interval Top: | 8358 ft. | # Of Holes: | 12 | | Interval Bottom: | 8470 ft. | Hole Size: | 0.34 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 1/31/2005 Interval Top: 7164 ft. Interval Bottom: 8332 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 1/31/2005 | Choke Size: | 0.188 in. | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/2/2004 | | Treatment Summary: | 12/3/04 B J SERVICES PERFORMED AN GELLED WATER FRAC WITH 3318 BBL OF LIGHTING 20# GEL SYSTEM USING 471000# OF 20/40 FRAC SAND AND 14000# OF RESIN COATED MSE 14/30 MESH SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8431 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/31/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 0 | | BTU_GAS | 1079 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 1056 | | CASING_PRESS | 1823 | | MCF_GAS | 1056 | | TUBING_PRESS | 1815 |
| | Perforation Data: | | Interval Top: | 7164 ft. | # Of Holes: | 54 | | Interval Bottom: | 8332 ft. | Hole Size: | 0.34 in. |
|
Formation WFCM Formation Classification: GW Status: SI - 1/1/2026| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 1/31/2005 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | No Perforation Data was found for formation WFCM. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|