Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09369
Well Classification: GW Status: SI - 1/1/2026
Well Name/No:PUCKETT #44C-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2026
FacilityID:269450LocationID:324244
County:GARFIELD #045Location:SESE 25 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8142 ft.
Basin:PICEANCE BASIN  
Planned Location:493FSL  656 FELLat/Long: 39.488148 / -108.161548Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.488114 / -108.161701Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 1/1/2026             Measured TD: 8937 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 1/1/2026
Wellbore Permit
Permit #:20031569 Expiration Date:9/17/2004
Proposed Depth/Form:9400 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/2/2004
Spud Date:9/10/2004Spud Date Is:ACTUAL
Measured TD:8937 ft.Measured PB depth:8907 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED NEUTRON, GAMMA RAY, DIPOLE SONIC, CCL,CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 24 in., Top: 0 ft., Depth: 100 ft., Weight: 44 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2611 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2611 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8907 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1050, Top: 5450 ft., Bottom: 8907 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4282 ft.NN
FORT UNION4580 ft.NN
WILLIAMS FORK5940 ft.NN
CAMEO8350 ft.NN
ROLLINS8740 ft.NN

Formation CMEO                     Formation Classification:  GW                     Status:  CM - 1/31/2005                 Interval Top: 8358 ft.    Interval Bottom: 8470 ft.

 Completed Information for Formation CAMEO
1st Production Date:1/31/2005Choke Size:0.188 in.
Formation Name:CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/2/2004
Treatment Summary:12/2/04 B J SERVICES PERFORMED AN GELLED WATER FRAC WITH 1784 BBL OF LIGHTING 22# GEL SYSTEM USING 166500# OF 20/40 FRAC SAND AND 6000# OF RESIN COATED MSE 14/30 MESH SAND.
Tubing Size:2.375 in.Tubing Setting Depth:8431 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/31/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 0
BTU_GAS 1079
CALC_BBLS_H2O 5
CALC_BBLS_OIL 0
CALC_MCF_GAS 1056
CASING_PRESS 1823
MCF_GAS 1056
TUBING_PRESS 1815
Perforation Data:
Interval Top:8358 ft.# Of Holes:12
Interval Bottom:8470 ft.Hole Size:0.34 in.

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 1/31/2005                 Interval Top: 7164 ft.    Interval Bottom: 8332 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:1/31/2005Choke Size:0.188 in.
Formation Name:WILLIAMS FORKCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/2/2004
Treatment Summary:12/3/04 B J SERVICES PERFORMED AN GELLED WATER FRAC WITH 3318 BBL OF LIGHTING 20# GEL SYSTEM USING 471000# OF 20/40 FRAC SAND AND 14000# OF RESIN COATED MSE 14/30 MESH SAND.
Tubing Size:2.375 in.Tubing Setting Depth:8431 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/31/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 0
BTU_GAS 1079
CALC_BBLS_H2O 5
CALC_BBLS_OIL 0
CALC_MCF_GAS 1056
CASING_PRESS 1823
MCF_GAS 1056
TUBING_PRESS 1815
Perforation Data:
Interval Top:7164 ft.# Of Holes:54
Interval Bottom:8332 ft.Hole Size:0.34 in.

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 1/1/2026

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/31/2005Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
No Perforation Data was found for formation WFCM.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No