|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/1/2004 Measured TD: 9004 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/1/2004 | | Wellbore Permit | | | Permit #: | 20031396 | Expiration Date: | 8/19/2004 | | Proposed Depth/Form: | 9300 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 7/28/2004 | | Spud Date: | 5/26/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 9004 ft. | Measured PB depth: | 8957 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR, COMP NEUTRONL, SONIC DIPOLE, CCL, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: 84 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2616 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 2616 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8957 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 900, Top: 4957 ft., Bottom: 8957 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4310 ft. | | N | N | | FORT UNION | 4686 ft. | | N | N | | WILLIAMS FORK | 6174 ft. | | N | N | | CAMEO | 8378 ft. | | N | N | | ROLLINS | 8844 ft. | | N | N |
Formation CMEO Formation Classification: GW Status: CM - 9/1/2004 Interval Top: 8414 ft. Interval Bottom: 8612 ft.| Completed Information for Formation CAMEO | | 1st Production Date: | 9/1/2004 | Choke Size: | 0.313 in. | | Formation Name: | CAMEO | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/28/2004 | | Treatment Summary: | 7/28/04 BJ SERVICES FRACED W/679 BBL OF 22# LIGHTING AND 78111# OF 20/40 AND 1569# OF 14/30 FLEX SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7712 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/1/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 0 | | BTU_GAS | 1079 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 235 | | CASING_PRESS | 1889 | | MCF_GAS | 235 | | TUBING_PRESS | 1756 |
| | Perforation Data: | | Interval Top: | 8414 ft. | # Of Holes: | 10 | | Interval Bottom: | 8612 ft. | Hole Size: | 0.34 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 9/1/2004 Interval Top: 7762 ft. Interval Bottom: 8326 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 9/1/2004 | Choke Size: | 0.313 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/28/2004 | | Treatment Summary: | 7/28/04 BJ SERVICES FRAC'D W/3690 BBL OF 22# LIGHTING 399852# OF 20/40 SAND AND 11436# OF 14/30 FLEX SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7712 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/1/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 0 | | BTU_GAS | 1079 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 235 | | CASING_PRESS | 1889 | | MCF_GAS | 235 | | TUBING_PRESS | 1756 |
| | Perforation Data: | | Interval Top: | 7762 ft. | # Of Holes: | 45 | | Interval Bottom: | 8326 ft. | Hole Size: | 0.34 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 9/1/2004| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/1/2004 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | No Perforation Data was found for formation WFCM. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 7449 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 3.521 |
| Average MCFE per Day | 20.426 |
| Federal Financial Assurance | i | |
|
|