Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09153
Well Classification: GW Status: PR - 10/17/2003
Well Name/No:MAGNALL #34-5 (L34)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/17/2003
FacilityID:266566LocationID:334916
County:GARFIELD #045Location:NWSW 34 6S92W 6
Field:MAMM CREEK - #52500Elevation:5875 ft.
Basin:PICEANCE BASIN  
Planned Location:2418FSL  627 FWLLat/Long: 39.482941 / -107.659883Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.482940 / -107.659750Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/17/2003             Measured TD: 6927 ft.    Vertical TD: 6804 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/17/2003
Wellbore PermitDIRECTIONAL
Permit #:20030373 Expiration Date:3/9/2004
Proposed Top PZ Location:Sec: Twp: Footage: 3292 FSL  649 FWL
Bottom Hole Location:Sec:34 Twp: Footage: 1970 FNL  650 FWL
Proposed Depth/Form:7200 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/3/2003
Spud Date:4/24/2003Spud Date Is:ACTUAL
Measured TD:6927 ft.Measured PB depth:6851 ft.
True Vertical TD:6804 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 3292 FSL  649 FWL
Bottom Hole Location:Sec:34 Twp: Footage: 1970 FNL  650 FWL
Log Types:PEX-AITH,CBL/GRCL/VDL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 778 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 776 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6918 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1540, Top: 400 ft., Bottom: 6918 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.3521 ft.NN
WILLIAMS FORK3522 ft.6702 ft.NN
ROLLINS6703 ft.6927 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 10/17/2003                Interval Top: 4606 ft.    Interval Bottom: 6632 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/3/2003
Treatment Summary:SEE SCANNED DOC.# 01257099
Tubing Size:2.375 in.Tubing Setting Depth:5637 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 288
BBLS_OIL 1
BTU_GAS 1170
CALC_BBLS_H2O 288
CALC_BBLS_OIL 1
CALC_GOR 2021
CALC_MCF_GAS 2021
CASING_PRESS 600
MCF_GAS 2021
Perforation Data:
Interval Top:4606 ft.# Of Holes:132
Interval Bottom:6632 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)94
Total Gas Produced (MCF)14611
GOR155436
GOR DeterminationMCFE
Average BOE per Day7.163
Average MCFE per Day41.517

 Federal Financial Assurance  i 

 Tribal Well  i No