Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09144
Well Classification: GW Status: PR - 9/14/2003
Well Name/No:FEDERAL #PA 312-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62161
Facility Status:PRStatus Date9/14/2003
FacilityID:266330LocationID:335129
County:GARFIELD #045Location:SWNW 28 6S95W 6
Field:PARACHUTE - #67350Elevation:5682 ft.
Basin:PICEANCE BASIN  
Planned Location:2288FNL  1013 FWLLat/Long: 39.496179 / -108.008823Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.496213 / -108.008786Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/14/2003             Measured TD: 7825 ft.    Vertical TD: 7739 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/14/2003
Wellbore Permit
Permit #:20030260 Expiration Date:2/24/2004
Proposed Top PZ Location:Sec: Twp: Footage: 1652 FNL  941 FWL
Bottom Hole Location:Sec: Twp: Footage: 1652 FNL  928 FWL
Proposed Depth/Form:7870 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-35 , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: , Depth: , Weight: 45 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/13/2003
Spud Date:7/15/2003Spud Date Is:ACTUAL
Measured TD:7825 ft.Measured PB depth:7781 ft.
True Vertical TD:7739 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1652 FNL  941 FWL
Bottom Hole Location:Sec: Twp: Footage: 1652 FNL  928 FWL
Log Types:CEMENT BOND LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2363 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: , Bottom: 2363 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7822 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 970, Top: 4330 ft., Bottom: 7822 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2158 ft.NN
FORT HAYS2520 ft.NN
MESAVERDE4396 ft.NN
CAMEO COAL7050 ft.NN
ROLLINS7780 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/14/2003                 Interval Top: 5834 ft.    Interval Bottom: 7670 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/13/2003
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7115 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/14/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 750
CASING_PRESS 2074
MCF_GAS 750
TUBING_PRESS 2150
Perforation Data:
Interval Top:5834 ft.# Of Holes:86
Interval Bottom:7670 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)7415
GOR570384
GOR DeterminationMCFE
Average BOE per Day3.540
Average MCFE per Day20.531

 Federal Financial Assurance  i Y

 Tribal Well  i No