|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 12/5/2003 Measured TD: 7824 ft. Vertical TD: 7418 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 12/5/2003 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20022054 | Expiration Date: | 11/20/2003 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1821 FNL 2022 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 1821 FNL 2022 FWL | | Proposed Depth/Form: | 8500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 16 in., Size: 13.375 in., Top: 0 ft., Depth: 60 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 75, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 3140 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 975, Top: 0 ft., Bottom: 3140 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/14/2004 | | Spud Date: | 4/1/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 7824 ft. | Measured PB depth: | 7817 ft. | | True Vertical TD: | 7418 ft. | True Vertical PB depth: | 7411 ft. | | Bottom Hole Location: | Sec: Twp: | Footage: 1821 FNL 2022 FWL | | Log Types: | RESERVOIR SATURATION, SCMT | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 42 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2484 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 900, Top: 0 ft., Bottom: 2484 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8023 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 760, Top: 4720 ft., Bottom: 8023 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | ROLLINS | | | N | N | | WASATCH G | 2659 ft. | | N | N | | FORT UNION | 3100 ft. | | N | N | | WILLIAMS FORK | 4905 ft. | | N | N | | CAMEO | 7475 ft. | | N | N | | No formation data to display. |
Sidetrack #01 Wellbore Classification: Status: PR - 8/1/2024 Measured TD: | Wellbore Data for Sidetrack #01 | Wellbore Classification: PR - 8/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20032554 | Expiration Date: | 1/11/2005 | | Proposed Top PZ Location: | Sec:8 Twp: 6S 96W | Footage: 1809 FNL 2018 FWL | | Bottom Hole Location: | Sec:8 Twp: 6S 96W | Footage: 1809 FNL 2108 FWL | | Proposed Depth/Form: | 8500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 42 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 75, Top: 0 ft., Bottom: 42 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 2484 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 2484 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8023 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 950, Top: 4720 ft., Bottom: 8023 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 11/13/2003 | Spud Date Is: | ACTUAL | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec:8 Twp: 6S 96W | Footage: 1809 FNL 2018 FWL |
Formation WMFK Formation Classification: GW Status: PR - 8/1/2024 Interval Top: 6402 ft. Interval Bottom: 7364 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 0.313 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | PRODUCING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/1/2004 | | Treatment Summary: | 6039-6402 1/15/04 BJ SERVICES FRACED W/2708 BBLS OF 20# LIGHTNING GEL 298000# OF 20/40 SAND AND 6000# OF 14/30 FLEX SAND; 6505-68911/15/04 BJ SERVICES FRACED WITH 2715 BBL OF 20# LIGHTNING GEL 299000# OF 20/40 SAND AND 60000/# OF 14/30 FLEX SAND;-CONT'D |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/1/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 2 | | BTU_GAS | 1063 | | CALC_GOR | 284000 | | CASING_PRESS | 750 | | GRAVITY_OIL | 59 | | MCF_GAS | 568 |
| | Perforation Data: | | Interval Top: | 6402 ft. | # Of Holes: | 94 | | Interval Bottom: | 7364 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 33 |
| Total Gas Produced (MCF) | 11053 |
| GOR | 334939 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.323 |
| Average MCFE per Day | 30.868 |
| Federal Financial Assurance | i | |
|
|