Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-08947
Well Classification: GW Status: PR - 6/11/2004
Well Name/No:ROSE RANCH #11-5(A10W)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/11/2004
FacilityID:264837LocationID:334924
County:GARFIELD #045Location:NENE 10 7S93W 6
Field:MAMM CREEK - #52500Elevation:6153 ft.
Basin:PICEANCE BASIN  
Planned Location:714FNL  1003 FELLat/Long: 39.465181 / -107.754945Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.465250 / -107.755010Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/11/2004             Measured TD: 8425 ft.    Vertical TD: 8070 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/11/2004
Wellbore PermitDIRECTIONAL
Permit #:20021781 Expiration Date:9/11/2003
Proposed Top PZ Location:Sec: Twp: SEC. 11 Footage: 1556 FNL  57 FWL
Bottom Hole Location:Sec: Twp: SEC 11 Footage: 1650 FNL  660 FWL
Proposed Depth/Form:8500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEDERAL
Unit:HUNTER MESA UNI Unit Number:COC 56608X
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/27/2003
Spud Date:5/9/2003Spud Date Is:ACTUAL
Measured TD:8425 ft.Measured PB depth:8372 ft.
True Vertical TD:8070 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: SEC. 11Footage: 1556 FNL  57 FWL
Bottom Hole Location:Sec: Twp: SEC 11Footage: 1650 FNL  660 FWL
Log Types:RST - GAMMA - CCL, BOND LOG -
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 840 ft., Weight: 17250 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: , Bottom: 850 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8420 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1150, Top: 900 ft., Bottom: 8425 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.4965 ft.NN
WILLIAMS FORK4966 ft.8425 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 6/11/2004                 Interval Top: 6395 ft.    Interval Bottom: 8117 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/27/2003
Treatment Summary:SEE SCANNED DOC# 1159763
Tubing Size:2.375 in.Tubing Setting Depth:7536 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/28/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 143
BBLS_OIL 50
BTU_GAS 1170
CALC_BBLS_H2O 143
CALC_BBLS_OIL 50
CALC_GOR 34
CALC_MCF_GAS 1720
CASING_PRESS 2400
MCF_GAS 1720
TUBING_PRESS 2200
Perforation Data:
Interval Top:6395 ft.# Of Holes:138
Interval Bottom:8117 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)61
Total Gas Produced (MCF)21021
GOR344606
GOR DeterminationMCFE
Average BOE per Day10.100
Average MCFE per Day58.569

 Federal Financial Assurance  i Y

 Tribal Well  i No