|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/1/2024 Measured TD: 9303 ft. Vertical TD: 9303 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/1/2024 | | Wellbore Permit | | | Permit #: | 20021163 | Expiration Date: | 8/15/2003 | | Proposed Depth/Form: | 9000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMRCM , Formation: WILLIAMS FK-ROLLINS-CAMEO , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 10/7/2002 | | Spud Date: | 8/27/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 9303 ft. | Measured PB depth: | 9204 ft. | | True Vertical TD: | 9303 ft. | True Vertical PB depth: | 9204 ft. | | Log Types: | TRIPLE COMBO HRI/SDL/DSN | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: 0 ft., Depth: 42 ft., Weight: 84 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 61 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2658 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 2658 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9204 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1200, Top: 5744 ft., Bottom: 9204 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 2412 ft. | | N | N | | WASATCH G | 4328 ft. | | N | N | | FORT UNION | 4629 ft. | | N | N | | WILLIAMS FORK | 6096 ft. | | N | N | | CAMEO | 8297 ft. | | N | N | | ROLLINS | 8704 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 7/1/2024 Interval Top: 8265 ft. Interval Bottom: 8568 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.313 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/7/2002 | | Treatment Summary: | 10/7/02 BJ SERVICES FRACED W/901 BBL OF 30# MEDALLION AND 60,500# OF 20/40 AND 2000# OF 14/40 FLEX SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8412 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/8/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 0 | | BTU_GAS | 1046 | | CASING_PRESS | 550 | | MCF_GAS | 847 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 8265 ft. | # Of Holes: | 20 | | Interval Bottom: | 8568 ft. | Hole Size: | |
|
Formation WMFK Formation Classification: GW Status: CM - 4/23/2007 Interval Top: 7261 ft. Interval Bottom: 7997 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 0.313 in. | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/7/2002 | | Treatment Summary: | SEE SCANNED DOC # 1098602 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8412 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/8/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BTU_GAS | 1046 | | CASING_PRESS | 550 | | MCF_GAS | 847 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 7261 ft. | # Of Holes: | 18 | | Interval Bottom: | 7997 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 10052 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 4.741 |
| Average MCFE per Day | 27.499 |
| Federal Financial Assurance | i | |
|
|