|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 3/1/2019 Measured TD: 7508 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 3/1/2019 | | Wellbore Permit | | | Permit #: | 20021022 | Expiration Date: | 8/15/2003 | | Proposed Depth/Form: | 7900 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMRCM , Formation: WILLIAMS FK-ROLLINS-CAMEO , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 12/11/2002 | | Spud Date: | 11/2/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 7508 ft. | Measured PB depth: | 7508 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | NEU,DENSITY,GR,IND,HRI/SDL/DSN | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 84 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2462 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 977, Top: 0 ft., Bottom: 2462 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7508 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 800, Top: 4420 ft., Bottom: 7508 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 2010 ft. | | N | N | | FORT UNION | 2631 ft. | | N | N | | WILLIAMS FORK | 4194 ft. | | N | N | | CAMEO | 6916 ft. | | N | N | | ROLLINS | 7386 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 3/1/2019 Interval Top: 6955 ft. Interval Bottom: 7176 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.875 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/11/2002 | | Treatment Summary: | 12/11/02 BJ SERVICES FRACED WITH 1421 BBL 18# VISTAR GEL 113,500# OF 20/40 SABD ABD 8000# 14/40 FLEX SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/14/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 60 | | BBLS_OIL | 0 | | BTU_GAS | 1172 | | CASING_PRESS | 30 | | MCF_GAS | 540 |
| | Perforation Data: | | Interval Top: | 6955 ft. | # Of Holes: | 10 | | Interval Bottom: | 7176 ft. | Hole Size: | |
|
Formation WMFK Formation Classification: GW Status: CM - 12/14/2002 Interval Top: 5364 ft. Interval Bottom: 6652 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 0.875 in. | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/11/2002 | | Treatment Summary: | 12/11/02 BJ SERVICES FRACED WITH 1883 BBL OF 18# VISTAR GEL 153,500# OF 20/40 SAND AND 4000# 14/40 FLEX SAND. (SEE SCANNED DOC.# 1098585 FOR DETAIL) |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/14/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 60 | | BBLS_OIL | 0 | | BTU_GAS | 1172 | | CASING_PRESS | 30 | | MCF_GAS | 540 |
| | Perforation Data: | | Interval Top: | 5364 ft. | # Of Holes: | 14 | | Interval Bottom: | 6652 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 10 |
| Total Gas Produced (MCF) | 6662 |
| GOR | 666200 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.170 |
| Average MCFE per Day | 18.414 |
| Federal Financial Assurance | i | |
|
|