|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/6/2002 Measured TD: 6945 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/6/2002 | | Wellbore Permit | | | Permit #: | 20021219 | Expiration Date: | 7/7/2003 | | Proposed Depth/Form: | 7000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-19 , Unit Acreage: 320, Drill Unit: S/2 |
| | |
| Wellbore Completed | | Completion Date: | 8/24/2002 | | Spud Date: | 7/21/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 6945 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL-GR-SP,NEUTRON DENSITY,CBL | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1556 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: , Bottom: 1556 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6934 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 820, Top: 4300 ft., Bottom: 6934 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1356 ft. | | N | N | | FORT UNION | 1768 ft. | | N | N | | MESAVERDE | 3555 ft. | | N | N | | CAMEO COAL | 6181 ft. | | N | N | | ROLLINS | 6865 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 9/6/2002 Interval Top: 4916 ft. Interval Bottom: 6775 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.188 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/24/2002 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6565 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/6/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 1461 | | CASING_PRESS | 1559 | | MCF_GAS | 1461 | | TUBING_PRESS | 1418 |
| | Perforation Data: | | Interval Top: | 4916 ft. | # Of Holes: | 92 | | Interval Bottom: | 6775 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 20 |
| Total Gas Produced (MCF) | 15550 |
| GOR | 777500 |
| GOR Determination | MCFE |
| Average BOE per Day | 7.401 |
| Average MCFE per Day | 42.937 |
| Federal Financial Assurance | i | |
|
|