Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-08167
Well Classification: GW Status: PR - 11/1/2018
Well Name/No:FEDERAL #PA 42-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62161
Facility Status:PRStatus Date11/1/2018
FacilityID:263978LocationID:335233
County:GARFIELD #045Location:SENE 27 6S95W 6
Field:PARACHUTE - #67350Elevation:5857 ft.
Basin:PICEANCE BASIN  
Planned Location:2460FNL  641 FELLat/Long: 39.495669 / -107.977713Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.495852 / -107.977751Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/1/2018             Measured TD: 8201 ft.    Vertical TD: 8171 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/1/2018
Wellbore PermitDIRECTIONAL
Permit #:20031252 Expiration Date:7/17/2004
Proposed Top PZ Location:Sec:27 Twp: 6S 95W Footage: 2212 FNL  339 FEL
Bottom Hole Location:Sec:27 Twp: 6S 95W Footage: 2180 FNL  300 FEL
Proposed Depth/Form:8270 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-35 , Unit Acreage: 320, Drill Unit: N/2
Casing:String Type: CONDUCTOR, Hole Size: , Size: 18 in., Top: , Depth: 45 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/22/2003
Spud Date:9/22/2003Spud Date Is:ACTUAL
Measured TD:8201 ft.Measured PB depth:8149 ft.
True Vertical TD:8171 ft.True Vertical PB depth:8122 ft.
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:DIDD SPACED NEU. W/GR & CBL W/GR & CCL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2774 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 990, Top: 0 ft., Bottom: 2798 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8198 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 920, Top: 4100 ft., Bottom: 8198 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2577 ft.NN
FORT SCOTT2871 ft.NN
MESAVERDE4818 ft.NN
CAMEO COAL7567 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/1/2018                 Interval Top: 6304 ft.    Interval Bottom: 8093 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:10/22/2003
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7587 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/18/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_MCF_GAS 1382
CASING_PRESS 1873
MCF_GAS 1382
TUBING_PRESS 1729
Perforation Data:
Interval Top:6304 ft.# Of Holes:75
Interval Bottom:8093 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)26
Total Gas Produced (MCF)10448
GOR401846
GOR DeterminationMCFE
Average BOE per Day5.018
Average MCFE per Day29.095

 Federal Financial Assurance  i Y

 Tribal Well  i No