Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-08140
Well Classification: GW Status: PR - 12/1/2017
Well Name/No:FEDERAL #PA 323-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62161
Facility Status:PRStatus Date12/1/2017
FacilityID:263760LocationID:335330
County:GARFIELD #045Location:NESW 26 6S95W 6
Field:PARACHUTE - #67350Elevation:5634 ft.
Basin:PICEANCE BASIN  
Planned Location:2126FSL  2374 FWLLat/Long: 39.494339 / -107.967022Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.494352 / -107.967049Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2017             Measured TD: 8110 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2017
Wellbore Permit
Permit #:20020920 Expiration Date:5/23/2003
Proposed Top PZ Location:Sec:29 Twp: 6S 95W Footage: 1804 FSL  1880 FWL
Bottom Hole Location:Sec:29 Twp: 6S 95W Footage: 1768 FSL  1821 FWL
Proposed Depth/Form:8120 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-35 , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: , Depth: 45 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/20/2002
Spud Date:9/16/2002Spud Date Is:ACTUAL
Measured TD:8110 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:THERMAL MULTIGATE DECAY LITHOLOGY LOG, C B L
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2580 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 1200, Top: 0 ft., Bottom: 2580 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8095 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 3800 ft., Bottom: 8095 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2358 ft.NN
FORT UNION2439 ft.NN
MESAVERDE4631 ft.NN
CAMEO COAL7459 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/1/2017                 Interval Top: 6141 ft.    Interval Bottom: 7997 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/20/2002
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7389 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/18/2002Test Method:
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1095
CASING_PRESS 1333
TUBING_PRESS 1125
Perforation Data:
Interval Top:6141 ft.# Of Holes:88
Interval Bottom:7997 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)29
Total Gas Produced (MCF)10382
GOR358000
GOR DeterminationMCFE
Average BOE per Day4.984
Average MCFE per Day28.902

 Federal Financial Assurance  i Y

 Tribal Well  i No