|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/1/2014 Measured TD: 7602 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/1/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20020598 | Expiration Date: | 3/20/2003 | | Proposed Top PZ Location: | Sec:33 Twp: 6S 94W | Footage: 1040 FSL 829 FEL | | Bottom Hole Location: | Sec:33 Twp: 6S 94W | Footage: 1036 FSL 751 FEL | | Proposed Depth/Form: | 7780 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-19 , Unit Acreage: 320, Drill Unit: E/2 |
| | |
| Wellbore Completed | | Completion Date: | 10/1/2002 | | Spud Date: | 5/11/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 7602 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | THERMAL MULTIGATE DECAY LITHOLOGY, CBL | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 1124 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7601 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 730, Top: 3540 ft., Bottom: 7601 ft., Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1967 ft. | | N | N | | MESAVERDE | 4456 ft. | | N | N | | CAMEO COAL | 7124 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 4/1/2014 Interval Top: 5834 ft. Interval Bottom: 7298 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.172 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/1/2002 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7005 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/11/2002 | Test Method: | | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 0 | | CALC_MCF_GAS | 1434 | | CASING_PRESS | 1469 | | TUBING_PRESS | 1308 |
| | Perforation Data: | | Interval Top: | 5834 ft. | # Of Holes: | 70 | | Interval Bottom: | 7298 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 3410 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 1.611 |
| Average MCFE per Day | 9.343 |
| Federal Financial Assurance | i | |
|
|