Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07851
Well Classification: GW Status: PR - 6/13/2001
Well Name/No:FEDERAL #GM 33-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC50783
Facility Status:PRStatus Date6/13/2001
FacilityID:260369LocationID:335148
County:GARFIELD #045Location:NESE 35 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5825 ft.
Basin:PICEANCE BASIN  
Planned Location:2643FSL  1210 FELLat/Long: 39.480409 / -108.070955Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.480605 / -108.070955Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/4/2001             Measured TD: 7170 ft.    Vertical TD: 7088 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/4/2001
Wellbore Permit
Permit #:011139 Expiration Date:6/12/2002
Proposed Top PZ Location:Sec:35 Twp: 6S 96W Footage: 2268 FSL  1960 FEL
Bottom Hole Location:Sec:35 Twp: 6S 96W Footage: 2264 FSL  1996 FEL
Proposed Depth/Form:7160 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: , Depth: 45 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/20/2002
Spud Date:4/20/2002Spud Date Is:ACTUAL
Measured TD:7170 ft.Measured PB depth:7120 ft.
True Vertical TD:7088 ft.True Vertical PB depth:7038 ft.
Log Types:THERMAL UNLTIGATE DECAY LITHOLOGY
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 962 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 962 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7160 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 3875 ft., Bottom: 7160 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2366 ft.NN
FORT UNION2684 ft.NN
MESAVERDE4090 ft.NN
CAMEO6671 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/24/2002                 Interval Top: 5420 ft.    Interval Bottom: 6970 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/24/2002Choke Size:0.275 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:Yes
Formation Treatment
Treatment Date:7/20/2002
Treatment Summary:2350 GALS 7.5% HCL; 411,000# 20/40 SAND & 11,750 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:6727 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/24/2002Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1099
CALC_MCF_GAS 1604
CASING_PRESS 1859
TUBING_PRESS 0
Perforation Data:
Interval Top:5420 ft.# Of Holes:136
Interval Bottom:6970 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)12699
GOR529125
GOR DeterminationMCFE
Average BOE per Day6.070
Average MCFE per Day35.184

 Federal Financial Assurance  i Y

 Tribal Well  i No