Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07830
Well Classification: GW Status: SI - 12/1/2025
Well Name/No:FEDERAL #GM 41-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62163
Facility Status:SIStatus Date12/1/2025
FacilityID:260202LocationID:335177
County:GARFIELD #045Location:SWNE 36 6S96W 6
Field:GRAND VALLEY - #31290Elevation:6037 ft.
Basin:PICEANCE BASIN  
Planned Location:1643FNL  1352 FELLat/Long: 39.482409 / -108.053595Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.482282 / -108.053501Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 12/1/2025             Measured TD: 7570 ft.    Vertical TD: 7506 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 12/1/2025
Wellbore Permit
Permit #:011033 Expiration Date:5/22/2002
Proposed Top PZ Location:Sec:36 Twp: 6S 96W Footage: 914 FNL  1094 FEL
Bottom Hole Location:Sec:36 Twp: 6S 96W Footage: 917 FNL  1093 FEL
Proposed Depth/Form:7490 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-35 , Unit Acreage: 160, Drill Unit: NE4
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: , Depth: 45 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/16/2001
Spud Date:8/2/2001Spud Date Is:ACTUAL
Measured TD:7570 ft.Measured PB depth:7444 ft.
True Vertical TD:7506 ft.True Vertical PB depth:7380 ft.
Top PZ Location:Sec: Twp: Footage: 883 FNL  1067 FEL
Bottom Hole Location:Sec: Twp: Footage: 822 FNL  1052 FEL
Log Types:DUAL INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON
Log Types:THERMAL MULIGATE DECAY LIGHOLOGY AND CEMENT BOND LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 917 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: , Bottom: 917 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7567 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 845, Top: 1940 ft., Bottom: 7567 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH G2341 ft.NN
FORT UNION2711 ft.NN
MESAVERDE4361 ft.NN
CAMEO6941 ft.NN
CAMEO COAL6941 ft.NN
ROLLINS7471 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 12/1/2025                 Interval Top: 5750 ft.    Interval Bottom: 7409 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/16/2001
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7213 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/16/2001Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1096
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1539
CASING_PRESS 2300
MCF_GAS 1539
TUBING_PRESS 2150
Perforation Data:
Interval Top:5750 ft.# Of Holes:80
Interval Bottom:7409 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)8
Total Gas Produced (MCF)6525
GOR815625
GOR DeterminationMCFE
Average BOE per Day3.116
Average MCFE per Day18.075

 Federal Financial Assurance  i Y

 Tribal Well  i No