Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07825
Well Classification: GW Status: PR - 2/1/2002
Well Name/No:FEDERAL #GM 12-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date2/1/2002
FacilityID:260197LocationID:311598
County:GARFIELD #045Location:NWNW 9 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6079 ft.
Basin:PICEANCE BASIN  
Planned Location:652FNL  531 FWLLat/Long: 39.456812 / -108.120430Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.456847 / -108.119960Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2002             Measured TD: 6574 ft.    Vertical TD: 6481 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2002
Wellbore Permit
Permit #:011028 Expiration Date:5/22/2002
Proposed Depth/Form:6460 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-35 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: , Depth: 45 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/1/2002
Spud Date:11/19/2001Spud Date Is:ACTUAL
Measured TD:6574 ft.Measured PB depth:6488 ft.
True Vertical TD:6481 ft.True Vertical PB depth:6395 ft.
Top PZ Location:Sec: Twp: Footage: 1497 FNL  495 FWL
Bottom Hole Location:Sec: Twp: Footage: 1587 FNL  488 FWL
Log Types:PNL, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1136 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 465, Top: , Bottom: 1136 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6571 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 3300 ft., Bottom: 6570 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH G1913 ft.NN
FORT UNION2293 ft.NN
MESAVERDE3584 ft.NN
CAMEO6060 ft.NN
ROLLINS6518 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/1/2002                  Interval Top: 4637 ft.    Interval Bottom: 6347 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/1/2002
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6192 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/6/2002Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1108
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1420
CASING_PRESS 957
MCF_GAS 1420
TUBING_PRESS 872
Perforation Data:
Interval Top:4637 ft.# Of Holes:64
Interval Bottom:6347 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)10723
GOR536150
GOR DeterminationMCFE
Average BOE per Day5.116
Average MCFE per Day29.714

 Federal Financial Assurance  i Y

 Tribal Well  i No