Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07778
Well Classification: GW Status: PR - 4/9/2001
Well Name/No:GM #321-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/9/2001
FacilityID:259747LocationID:311597
Municipality/County:PARACHUTE / GARFIELD #045Location:NENW 12 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5129 ft.
Basin:PICEANCE BASIN  
Planned Location:1146FNL  2013 FWLLat/Long: 39.456479 / -108.060875Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.456551 / -108.061098Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/23/2001             Measured TD: 6210 ft.    Vertical TD: 6188 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/23/2001
Wellbore Permit
Permit #:010626 Expiration Date:4/8/2002
Proposed Top PZ Location:Sec:12 Twp: 7S 96W Footage: 807 FNL  2277 FWL
Bottom Hole Location:Sec:12 Twp: 7S 96W Footage: 741 FNL  2317 FWL
Proposed Depth/Form:6215 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-7 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:12/20/2001
Spud Date:10/2/2001Spud Date Is:ACTUAL
Measured TD:6210 ft.Measured PB depth:6140 ft.
True Vertical TD:6188 ft.True Vertical PB depth:6118 ft.
Top PZ Location:Sec: Twp: Footage: 834 FNL  2269 FWL
Bottom Hole Location:Sec: Twp: Footage: 821 FNL  2269 FWL
Log Types:THERMAL MULTIGATE DECAY LITHOLOGY WITH CEMENT BOND LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 622 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 622 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6200 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 4100 ft., Bottom: 6199 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
FORT UNION1636 ft.NN
MESAVERDE3167 ft.NN
CAMEO COAL5698 ft.NN
ROLLINS6179 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/23/2001                 Interval Top: 4495 ft.    Interval Bottom: 6002 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/20/2001
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:5661 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/22/2001Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1073
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1830
CASING_PRESS 1938
MCF_GAS 1830
TUBING_PRESS 1899
Perforation Data:
Interval Top:4495 ft.# Of Holes:76
Interval Bottom:6002 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)20270
GOR750740
GOR DeterminationMCFE
Average BOE per Day9.662
Average MCFE per Day56.042

 Federal Financial Assurance  i 

 Tribal Well  i No