Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07727
Well Classification: GW Status: PR - 9/1/2004
Well Name/No:JACKSON #9-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2004
FacilityID:259438LocationID:335347
County:GARFIELD #045Location:NWSE 28 6S92W 6
Field:MAMM CREEK - #52500Elevation:5792 ft.
Basin:PICEANCE BASIN  
Planned Location:1985FSL  1960 FELLat/Long: 39.496121 / -107.669193Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.496194 / -107.669042Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2004             Measured TD: 6670 ft.    Vertical TD: 6448 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2004
Wellbore Permit
Permit #:010418 Expiration Date:3/4/2002
Proposed Depth/Form:6500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/13/2001
Spud Date:5/1/2001Spud Date Is:ACTUAL
Measured TD:6670 ft.Measured PB depth:6632 ft.
True Vertical TD:6448 ft.True Vertical PB depth:6410 ft.
Top PZ Location:Sec: Twp: Footage: 1978 FSL  670 FEL
Bottom Hole Location:Sec: Twp: Footage: 1940 FSL  615 FEL
Log Types:DIL/SDL/DSN
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 660 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 660 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6670 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1070, Top: 0 ft., Bottom: 6670 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.3390 ft.NN
OHIO CREEK3942 ft.5130 ft.NN
WILLIAMS FORK3942 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 9/1/2004                  Interval Top: 5300 ft.    Interval Bottom: 6250 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:THROUGH TUBING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/13/2001
Treatment Summary:5300-5419 FRACED W/370000# 20/40 SAND PLUS 2946 BBL 2% KCL WATER. 5517-5787 FRACED W/299700# 20/40 SAND PLUS 2690 BBL 2% KCL WATER. 5908-6250 FRACED W/170000# 20/40 SAND PLUS 1547 BBL 2% KCL WATER.
Tubing Size:2.375 in.Tubing Setting Depth:6103 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/20/2001Test Method:
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 71
BTU_GAS 1170
CALC_BBLS_H2O 2
CALC_BBLS_OIL 71
CALC_GOR 10197
CALC_MCF_GAS 704
CASING_PRESS 1075
GRAVITY_OIL 40
MCF_GAS 724
TUBING_PRESS 820
Perforation Data:
Interval Top:5300 ft.# Of Holes:52
Interval Bottom:6250 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)5
Total Gas Produced (MCF)2556
GOR511200
GOR DeterminationMCFE
Average BOE per Day1.220
Average MCFE per Day7.089

 Federal Financial Assurance  i 

 Tribal Well  i No