|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 8/1/2025 Measured TD: 6545 ft. Vertical TD: 6200 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 8/1/2025 | | Wellbore Permit | | | Permit #: | 001110 | Expiration Date: | 10/12/2001 | | Proposed Depth/Form: | 6200 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | GRASS MESA UNIT | Unit Number: | COC56608A | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 3/21/2001 | | Spud Date: | 11/14/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 6545 ft. | Measured PB depth: | 6370 ft. | | True Vertical TD: | 6200 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 662 FNL 1785 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 660 FNL 1980 FWL | | Log Types: | CBL/CCL/RST/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 626 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 626 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6440 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 850, Top: 2600 ft., Bottom: 6440 ft., Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 4076 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: SI - 8/1/2025 Interval Top: 4965 ft. Interval Bottom: 6300 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/21/2001 | | Treatment Summary: | STAGE1: PERFS 6220-6300'.PUMP STAGE 1 STIMULATION WITH TRACER, 98,000# 20/40 WHITE SAND, 816 BBL VISTAR 16. START FLOWBACK TO PUT ON 20/40 CHOKE. STAGE2:PERFS 5775'(CONT) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5878 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/22/2001 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 48 | | BBLS_OIL | 20 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 48 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 53000 | | CALC_MCF_GAS | 1069 | | CASING_PRESS | 820 | | MCF_GAS | 1069 | | TUBING_PRESS | 590 |
| | Perforation Data: | | Interval Top: | 4965 ft. | # Of Holes: | 228 | | Interval Bottom: | 6300 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 17 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.008 |
| Average MCFE per Day | 0.046 |
| Federal Financial Assurance | i | Y |
|
|