|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/26/2000 Measured TD: | Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/26/2000 | | Wellbore Permit | | | Permit #: | 000418 | Expiration Date: | 5/4/2001 | | Proposed Depth/Form: | 6140 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 510-3 , Unit Acreage: 40, Drill Unit: NWSE |
| | |
| Wellbore Completed | | Completion Date: | 7/12/2000 | | Spud Date: | 5/24/2000 | Spud Date Is: | ACTUAL | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DUAL INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON | | Log Types: | DUAL IND SPEC DENS DUAL SPACED NEUT. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 329 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 329 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6136 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 920, Top: , Bottom: 6136 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | | | N | N | | MESAVERDE | 3170 ft. | | N | N | | CAMEO COAL | 5653 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 7/26/2000 Interval Top: 4461 ft. Interval Bottom: 6047 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/12/2000 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5657 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/19/2000 | Test Method: | | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | CALC_BBLS_H2O | 10 | | CALC_MCF_GAS | 1231 | | CASING_PRESS | 1591 | | MCF_GAS | 1231 | | TUBING_PRESS | 1471 |
| | Perforation Data: | | Interval Top: | 4461 ft. | # Of Holes: | 66 | | Interval Bottom: | 6047 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 14 |
| Total Gas Produced (MCF) | 12132 |
| GOR | 866571 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.769 |
| Average MCFE per Day | 33.464 |
| Federal Financial Assurance | i | |
|
|