Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07411
Well Classification: GW Status: PR - 11/4/1999
Well Name/No:FEDERAL #GM 14-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/4/1999
FacilityID:199990LocationID:324072
County:GARFIELD #045Location:SWSW 4 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5887 ft.
Basin:PICEANCE BASIN  
Planned Location:400FSL  527 FWLLat/Long: 39.459699 / -108.120537Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.459772 / -108.120462Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/4/1999             Measured TD: 6540 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/4/1999
Wellbore Permit
Permit #:990519 Expiration Date:7/22/2000
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 510-1 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:10/27/1999
Spud Date:9/3/1999Spud Date Is:ACTUAL
Measured TD:6540 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON CBL
Casing:String Type: SURF, Hole Size: 13.25 in., Size: 9.625 in., Top: , Depth: 326 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 326 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6518 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1100, Top: 3680 ft., Bottom: 6517 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1715 ft.NN
MESAVERDE3438 ft.NN
CAMEO COAL5878 ft.NN
ROLLINS6358 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/4/1999                 Interval Top: 4662 ft.    Interval Bottom: 6288 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/27/1999Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:5878 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/30/1999Test Method:
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_BBLS_H2O 5
CALC_MCF_GAS 1446
CASING_PRESS 1633
TUBING_PRESS 1519
Perforation Data:
Interval Top:4662 ft.# Of Holes:60
Interval Bottom:6288 ft.Hole Size:

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 11/4/1999

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WMFK.
No Perforation Data was found for formation WMFK.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)10487
GOR873916
GOR DeterminationMCFE
Average BOE per Day4.987
Average MCFE per Day28.935

 Federal Financial Assurance  i Y

 Tribal Well  i No