Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07373
Well Classification: GW Status: PR - 10/7/1999
Well Name/No:UNOCAL #GM 32-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/7/1999
FacilityID:89045LocationID:324064
County:GARFIELD #045Location:SWNE 1 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5410 ft.
Basin:PICEANCE BASIN  
Planned Location:1488FNL  1518 FELLat/Long: 39.469839 / -108.054235Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.469536 / -108.054524Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/7/1999             Measured TD: 6794 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/7/1999
Wellbore Permit
Permit #:990276 Expiration Date:5/4/2000
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 139-28 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:7/12/1999
Spud Date:6/25/1999Spud Date Is:ACTUAL
Measured TD:6794 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 329 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: , Bottom: 329 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6786 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 950, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1539 ft.NN
MESAVERDE3612 ft.NN
CAMEO COAL6005 ft.NN
ROLLINS6626 ft.NN

Formation ROLCM                   Formation Classification:  OW                   Status:  AB - 9/7/1999                  Interval Top: 6620 ft.    Interval Bottom: 6640 ft.

 Completed Information for Formation ROLLINS-CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:ROLLINS-CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/12/1999
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation ROLCM.
Perforation Data:
Interval Top:6620 ft.# Of Holes:
Interval Bottom:6640 ft.Hole Size:

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 10/7/1999                 Interval Top: 4712 ft.    Interval Bottom: 6396 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/31/1999Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:6355 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/2/1999Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 0
CALC_BBLS_H2O 1
CALC_BBLS_OIL 0
CALC_MCF_GAS 1753
CASING_PRESS 1711
MCF_GAS 1753
TUBING_PRESS 1654
Perforation Data:
Interval Top:4712 ft.# Of Holes:584
Interval Bottom:6396 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)10368
GOR864000
GOR DeterminationMCFE
Average BOE per Day4.932
Average MCFE per Day28.608

 Federal Financial Assurance  i 

 Tribal Well  i No