Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07370
Well Classification: GW Status: PR - 12/1/2017
Well Name/No:UNOCAL #GM 42-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2017
FacilityID:89042LocationID:324062
County:GARFIELD #045Location:SENE 1 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5250 ft.
Basin:PICEANCE BASIN  
Planned Location:2395FNL  402 FELLat/Long: 39.467599 / -108.050334Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.467457 / -108.050765Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2017             Measured TD: 6510 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2017
Wellbore Permit
Permit #:990273 Expiration Date:5/4/2000
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:9/4/1999
Spud Date:7/14/1999Spud Date Is:ACTUAL
Measured TD:6510 ft.Measured PB depth:6497 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRO
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 316 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: , Bottom: 316 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 3498 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 865, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1543 ft.NN
MESAVERDE3450 ft.NN
CAMEO COAL5945 ft.NN
ROLLINS6470 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/1/2017                 Interval Top: 4190 ft.    Interval Bottom: 6278 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/4/1999Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/4/1999
Treatment Summary:FRAC'D W/ 845000# 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:5794 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/7/1999Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
CALC_BBLS_H2O 10
CALC_MCF_GAS 1011
CASING_PRESS 1576
MCF_GAS 1011
TUBING_PRESS 1448
Perforation Data:
Interval Top:4190 ft.# Of Holes:492
Interval Bottom:6278 ft.Hole Size:

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 8/4/1999

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WMFK.
No Perforation Data was found for formation WMFK.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)1693
GOR
GOR DeterminationMCFE
Average BOE per Day0.800
Average MCFE per Day4.637

 Federal Financial Assurance  i 

 Tribal Well  i No