Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07243
Well Classification: GW Status: PR - 8/12/2005
Well Name/No:BOSELY #SG 43-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:13286
Facility Status:PRStatus Date8/12/2005
FacilityID:211483LocationID:334580
County:GARFIELD #045Location:NESE 22 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5125 ft.
Basin:PICEANCE BASIN  
Planned Location:1723FSL  569 FELLat/Long: 39.420559 / -108.088995Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.420703 / -108.089028Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/12/2005             Measured TD: 5280 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/12/2005
Wellbore Permit
Permit #:970883 Expiration Date:11/23/1998
Proposed Depth/Form:
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 510-1 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:5/28/1998
Spud Date:3/10/1998Spud Date Is:ACTUAL
Measured TD:5280 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 546 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 325, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5265 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
MESAVERDE2305 ft.
CAMEO COAL4745 ft.
ROLLINS5198 ft.

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 8/12/2005                 Interval Top: 3296 ft.    Interval Bottom: 4996 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.750 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/28/1998
Treatment Summary:3750 GALS 7 1/2% HCL, 500 GALS 10% ACETIC ACID, 1785200# 20/40, 8431 BBLS GEL, 1593 BBLS SLICK WATER, 66 TONS CO2
Tubing Size:2.375 in.Tubing Setting Depth:4676 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/12/2005Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 149
CASING_PRESS 453
TUBING_PRESS 216
Perforation Data:
Interval Top:3296 ft.# Of Holes:102
Interval Bottom:4996 ft.Hole Size:0.34 in.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 5/31/1998

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/28/1998Choke Size:0.000 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
No Perforation Data was found for formation WFCM.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)7
Total Gas Produced (MCF)5323
GOR760428
GOR DeterminationMCFE
Average BOE per Day2.532
Average MCFE per Day14.703

 Federal Financial Assurance  i 

 Tribal Well  i No