Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-06989
Well Classification: GW Status: PR - 9/11/2000
Well Name/No:FEDERAL #DOE 2-M-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/11/2000
FacilityID:211230LocationID:335235
County:GARFIELD #045Location:NWSW 35 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5449 ft.
Basin:PICEANCE BASIN  
Planned Location:2028FSL  772 FWLLat/Long: 39.478808 / -108.082496Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.478871 / -108.082488Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 5/31/1995             Measured TD: 7054 ft.    Vertical TD: 6593 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 5/31/1995
Wellbore PermitDIRECTIONAL
Permit #:950473 Expiration Date:11/28/1995
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:C27743
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 479 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:5/31/1995
Spud Date:5/2/1995Spud Date Is:ACTUAL
Measured TD:7054 ft.Measured PB depth:3700 ft.
True Vertical TD:6593 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 13.25 in., Size: 9.625 in., Top: 0 ft., Depth: 327 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 150, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
MESAVERDE3541 ft.
CAMEO COAL6173 ft.

Formation MVRD                     Formation Classification:  GW                     Status:  CM - 5/31/1995                 Interval Top: 3541 ft.

 Completed Information for Formation MESAVERDE
1st Production Date:N/AChoke Size:0.000 in.
Formation Name:MESAVERDECommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MVRD.
No Perforation Data was found for formation MVRD.

Formation WFCM                     Formation Classification:  GW                     Status:  AB - 5/31/1995

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/31/1995
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:

Sidetrack #01             Wellbore Classification: GW             Status: PR - 9/11/2000             Measured TD: 7200 ft.    Vertical TD: 6822 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: GW        PR - 9/11/2000
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:N/A
Proposed Depth/Form:
Surface Mineral Owner Same:
Mineral Owner:Surface Owner:
Unit: Unit Number: 

Wellbore Completed
Completion Date:12/15/1998
Spud Date:5/2/1995Spud Date Is:ACTUAL
Measured TD:7200 ft.Measured PB depth:
True Vertical TD:6822 ft.True Vertical PB depth:

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/11/2000                 Interval Top: 5616 ft.    Interval Bottom: 7014 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/15/1998
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7023 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/19/1995Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 22
CALC_BBLS_H2O 20
CALC_BBLS_OIL 22
CALC_GOR 98909
CALC_MCF_GAS 2176
CASING_PRESS 1780
MCF_GAS 2176
TUBING_PRESS 1680
Perforation Data:
Interval Top:5616 ft.# Of Holes:64
Interval Bottom:7014 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)15
Total Gas Produced (MCF)12847
GOR856466
GOR DeterminationMCFE
Average BOE per Day6.107
Average MCFE per Day35.395

 Federal Financial Assurance  i Y

 Tribal Well  i No