Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-06969
Well Classification: CBM Status: PR - 8/23/2002
Well Name/No:CLOUGH #RMV 36-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:13141
Facility Status:PRStatus Date8/23/2002
FacilityID:211210LocationID:335070
County:GARFIELD #045Location:NWSW 22 6S94W 6
Field:RULISON - #75400Elevation:5401 ft.
Basin:PICEANCE BASIN  
Planned Location:2200FSL  400 FWLLat/Long: 39.509419 / -107.882460Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.509545 / -107.882580Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/23/2002             Measured TD: 7448 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/23/2002
Wellbore Permit
Permit #:941855 Expiration Date:5/29/1995
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 139 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:8/22/2002
Spud Date:2/22/1995Spud Date Is:ACTUAL
Measured TD:7448 ft.Measured PB depth:7400 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIFL, GR, CAL, C B L
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 329 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: , Bottom: 329 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7444 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 855, Top: , Bottom: 7443 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1634 ft.NN
MESAVERDE4123 ft.NN
CAMEO6953 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/23/2002                 Interval Top: 5526 ft.    Interval Bottom: 5707 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/15/1995Choke Size:0.281 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/22/2002
Treatment Summary:1000 GALS 7.5% HCL; 139,000# 20/40 SAND & 3214 BBLS SLICK WATER.
Tubing Size:2.375 in.Tubing Setting Depth:5340 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/23/2002Test Method:FLOWING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_OIL 0
BTU_GAS 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 99
CASING_PRESS 451
MCF_GAS 99
TUBING_PRESS 277
Perforation Data:
Interval Top:5526 ft.# Of Holes:18
Interval Bottom:5707 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)8195
GOR682916
GOR DeterminationMCFE
Average BOE per Day3.904
Average MCFE per Day22.648

 Federal Financial Assurance  i 

 Tribal Well  i No