Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-06944
Well Classification: GW Status: PR - 12/21/1995
Well Name/No:CURFMAN #W 15-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:12582
Facility Status:PRStatus Date12/21/1995
FacilityID:211185LocationID:334825
County:GARFIELD #045Location:NWSE 5 7S95W 6
Field:PARACHUTE - #67350Elevation:5080 ft.
Basin:PICEANCE BASIN  
Planned Location:1790FSL  2340 FELLat/Long: 39.464369 / -108.020204Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.464478 / -108.020347Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/21/1995             Measured TD: 1470 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/21/1995
Wellbore Permit
Permit #:941600 Expiration Date:4/11/1995
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: 0 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:12/15/1995
Spud Date:11/28/1994Spud Date Is:ACTUAL
Measured TD:1470 ft.Measured PB depth:1432 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 298 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 298 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1460 ft., Weight: 10.5 & 11, Citings Type: ACTUAL
Cement:Sacks: 250, Top: 208 ft., Bottom: 1460 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.
WASATCH G1222 ft.

Formation WSTC                     Formation Classification:  GW                     Status:  PR - 12/1/2010                 Interval Top: 1253 ft.    Interval Bottom: 1263 ft.

 Completed Information for Formation WASATCH
1st Production Date:N/AChoke Size:0.000 in.
Formation Name:WASATCHCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/19/1995Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 240
MCF_GAS 600
TUBING_PRESS 220
Perforation Data:
Interval Top:1253 ft.# Of Holes:22
Interval Bottom:1263 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)8372
GOR761090
GOR DeterminationMCFE
Average BOE per Day3.977
Average MCFE per Day23.080

 Federal Financial Assurance  i 

 Tribal Well  i No