|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 6/25/1997 Measured TD: 7595 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 6/25/1997 | | Wellbore Permit | | | Permit #: | 931860 | Expiration Date: | 4/2/1994 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 0 , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | 2/2/1995 | | Measured TD: | 7595 ft. | Measured PB depth: | 7511 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 41 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2307 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7598 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 3670 ft. | | | | | ILES | 7373 ft. | | | | | MANCOS | 7478 ft. | | | |
Formation CAMMV Formation Classification: GW Status: CM - 6/25/1997| Completed Information for Formation CAMEO COALS-MESAVERDE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CAMEO COALS-MESAVERDE | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CAMMV. |
| | No Perforation Data was found for formation CAMMV. |
|
Formation CMEOC Formation Classification: GW Status: CM - 6/25/1997| Completed Information for Formation CAMEO COAL | | 1st Production Date: | 2/2/1995 | Choke Size: | 1,664.000 in. | | Formation Name: | CAMEO COAL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CMEOC. |
| | No Perforation Data was found for formation CMEOC. |
|
Formation WFCM Formation Classification: GW Status: PR - 4/1/2012| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | No Perforation Data was found for formation WFCM. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 12 |
| Total Gas Produced (MCF) | 9660 |
| GOR | 805000 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.599 |
| Average MCFE per Day | 26.670 |
| Federal Financial Assurance | i | Y |
|
|