Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-06817
Well Classification: GW Status: PR - 7/15/1994
Well Name/No:FEDERAL #MV 61-8D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:13097
Facility Status:PRStatus Date7/15/1994
FacilityID:211059LocationID:334950
County:GARFIELD #045Location:SWNE 8 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6189 ft.
Basin:PICEANCE BASIN  
Planned Location:1790FNL  2509 FELLat/Long: 39.454079 / -108.131127Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.454331 / -108.130365Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/15/1994             Measured TD: 6885 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/15/1994
Wellbore PermitDIRECTIONAL
Permit #:931400 Expiration Date:1/28/1994
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:C-36219
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 0 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:4/7/1994
Spud Date:10/31/1993Spud Date Is:ACTUAL
Measured TD:6885 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 301 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 130, Top: 0 ft., Bottom: 301 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6881 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1435, Top: 1820 ft., Bottom: 6881 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2121 ft.
FORT UNION2325 ft.
MESAVERDE3648 ft.
CAMEO COAL6208 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/15/1994                 Interval Top: 5478 ft.    Interval Bottom: 6751 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/6/1994Choke Size:0.000 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:5478 ft.# Of Holes:56
Interval Bottom:6751 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)7968
GOR346434
GOR DeterminationMCFE
Average BOE per Day3.822
Average MCFE per Day22.206

 Federal Financial Assurance  i Y

 Tribal Well  i No