Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-06802
Well Classification: GW Status: PR - 10/8/2007
Well Name/No:FEDERAL #GR 21-3 V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:12637
Facility Status:PRStatus Date10/8/2007
FacilityID:211044LocationID:334818
County:GARFIELD #045Location:NWNW 3 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5411 ft.
Basin:PICEANCE BASIN  
Planned Location:600FNL  1168 FWLLat/Long: 39.471550 / -108.099913Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.471824 / -108.099789Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/8/2007             Measured TD: 6450 ft.    Vertical TD: 6450 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/8/2007
Wellbore Permit
Permit #:930934 Expiration Date:11/13/1993
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:C 34553-A
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 0 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:8/8/1993
Spud Date:7/27/1993Spud Date Is:ACTUAL
Measured TD:6450 ft.Measured PB depth:6430 ft.
True Vertical TD:6450 ft.True Vertical PB depth:6430 ft.
Bottom Hole Location:Sec:3 Twp: 7s 96wFootage: 894 FNL  2047 FWL
Log Types:
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 328 ft., Weight: 0 , Citings Type: ACTUAL
Cement:Sacks: 120, Top: 0 ft., Bottom: 328 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 328 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 120, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6429 ft., Weight: 0 , Citings Type: ACTUAL
Cement:Sacks: 1115, Top: 2450 ft., Bottom: 6429 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6430 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Additional Cement:String Type: 1ST , Top: 1200 ft., Depth: 1200 ft., Bottom: 1228 ft., Sacks: 40, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 695 ft., Bottom: 695 ft., Sacks: 155, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
WASATCH G1674 ft.
FORT UNION1936 ft.
MESAVERDE3338 ft.
CAMEO5831 ft.
ROLLINS6312 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/1/2012

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/21/1993Choke Size:0.000 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
No Perforation Data was found for formation WFCM.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)7
Total Gas Produced (MCF)4728
GOR675428
GOR DeterminationMCFE
Average BOE per Day2.255
Average MCFE per Day13.069

 Federal Financial Assurance  i Y

 Tribal Well  i No