Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-06510
Well Classification: GW Status: PR - 1/16/2026
Well Name/No:ARCO DEEP #1-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:12675
Facility Status:PRStatus Date1/16/2026
FacilityID:210752LocationID:322539
County:GARFIELD #045Location:NESW 27 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8362 ft.
Basin:PICEANCE BASIN  
Planned Location:2104FSL  2156 FWLLat/Long: 39.492515 / -108.207687Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.492574 / -108.207760Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/16/2026             Measured TD: 15531 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/16/2026
Wellbore Permit
Permit #:850847 Expiration Date:10/26/1985
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 0 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:8/15/1987
Measured TD:15531 ft.Measured PB depth:14409 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 1 ft., Depth: 147 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 185, Top: 1 ft., Bottom: 147 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 1 ft., Depth: 6185 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1200, Top: 1 ft., Bottom: 6185 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 5.5 in., Top: 1 ft., Depth: 14661 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 3135, Top: 1 ft., Bottom: 14661 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
CRETACEOUS5434 ft.
CAMEO8147 ft.
ROLLINS8460 ft.
COZZETTE8680 ft.
CORCORAN8963 ft.
MANCOS9216 ft.
NIOBRARA11900 ft.
FRONTIER13060 ft.
MOWRY13095 ft.
MORRISON13598 ft.
ENTRADA14102 ft.
CHINLE14335 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/16/2026                 Interval Top: 7003 ft.    Interval Bottom: 8119 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/28/1987Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/15/1987
Treatment Summary:2500 GALS 7 1/2% HCL, 354900# 20/40, 407 TONS CO2, 6898 BBLS SLICK WATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1278
CASING_PRESS 1263
MCF_GAS 1278
TUBING_PRESS 1166
Perforation Data:
Interval Top:7003 ft.# Of Holes:76
Interval Bottom:8119 ft.Hole Size:0.42 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
07/15/2025
Defined InactiveN 
Low ProducingYProduction Period
11/2024 - 10/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No