Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-039-06742
Well Classification: OW Status: PR - 2/5/2024
Well Name/No:Crystal 6-65 22-10 #10HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:GMT EXPLORATION COMPANY LLC - 10243
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/5/2024
FacilityID:480446LocationID:479191
County:ELBERT #039Location:NESE 22 6S65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:6176 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1931FSL  738 FELLat/Long: 39.512206 / -104.645398Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.512208 / -104.645396Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/15/2022
End Date: 7/25/2022
Reported: 11/16/2022
Days to report: 114
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/5/2024             Measured TD: 20335 ft.    Vertical TD: 8200 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/5/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/15/2024
Proposed Top PZ Location:Sec:22 Twp: 6S 65W Footage: 2047 FNL  680 FEL
Bottom Hole Location:Sec:10 Twp: 6S 65W Footage: 804 FNL  665 FEL
Proposed Depth/Form:20552 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-1184 , Unit Acreage: 1600, Drill Unit: 10&15:All;22:N/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2650 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 385, Top: 0 ft., Bottom: 2650 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20552 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3080, Top: , Bottom: 20552 ft.

Wellbore Completed
Completion Date:6/29/2022
Spud Date:6/17/2022Spud Date Is:ACTUAL
Measured TD:20335 ft.Measured PB depth:20308 ft.
True Vertical TD:8200 ft.True Vertical PB depth:8200 ft.
Top PZ Location:Sec:22 Twp: 6S 65WFootage: 2047 FNL  680 FEL
Bottom Hole Location:Sec:10 Twp: 6S 65WFootage: 804 FNL  665 FEL
Log Types:MUDLOG, DIL,CBL, MWD/LWD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2727 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 693, Top: 0 ft., Bottom: 2727 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20324 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3005, Top: 100 ft., Bottom: 20324 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
DAWSON353 ft.
DENVER566 ft.
ARAPAHOE1491 ft.
FOX HILLS2227 ft.
PIERRE2610 ft.
SUSSEX3354 ft.
SHANNON5609 ft.
SHARON SPRINGS7827 ft.
NIOBRARA7977 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/5/2024                  Interval Top: 8543 ft.    Interval Bottom: 20275 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/1/2022Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:7/17/2022Treatment End Date:8/12/2022
Treatment Summary:Completion type was a plug and perf, 60 stages, max pressure 9,300 psi, main fluid type was LibertyFR, proppant type 40/70 white,100 mesh.
Total fluid used in treatment (bbls):545261Max pressure during treatment (psi):9500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:60
Total acid used in treatment (bbls):248Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):18638Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):545013Disposition method For flowback:DISPOSAL
Total proppant used (lbs):20079350Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:7/15/2022Treatment End Date:7/25/2022
Treatment Summary:Completion type was a plug and perf, 60 stages, max pressure 9,300 psi, main fluid type was LibertyFR, proppant type 40/70 white,100 mesh.
Total fluid used in treatment (bbls):563899Max pressure during treatment (psi):9500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:60
Total acid used in treatment (bbls):248Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):18638Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):545013Disposition method For flowback:DISPOSAL
Total proppant used (lbs):20079350Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8738 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/13/2022Test Method:Flowback
Hours Tested:12Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 395
CALC_BBLS_H2O 790
CASING_PRESS 2200
TUBING_PRESS 2200
Perforation Data:
Interval Top:8543 ft.# Of Holes:9480
Interval Bottom:20275 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)17200
Total Gas Produced (MCF)50265
GOR2922
GOR DeterminationBOE
Average BOE per Day70.860
Average MCFE per Day411.014

 Federal Financial Assurance  i 

 Tribal Well  i No