|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2022 Measured TD: 8020 ft. Vertical TD: 8020 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2022 | | Wellbore Permit | | | Permit #: | 19870148 | Expiration Date: | 7/9/1987 | | Proposed Depth/Form: | 8015 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 40, Drill Unit: SWNE |
| | |
| Wellbore Completed | | Completion Date: | 6/22/1988 | | Spud Date: | 3/26/1987 | Spud Date Is: | ACTUAL | | Measured TD: | 8020 ft. | Measured PB depth: | 7964 ft. | | True Vertical TD: | 8020 ft. | True Vertical PB depth: | | | Log Types: | DIGL-CAL-SDL-DSN-GR | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 403 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8020 ft., Weight: 17 &15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1547 ft. | | | | | NIOBRARA | 7098 ft. | | | | | FORT HAYS | 7426 ft. | | | | | CARLILE | 7463 ft. | | | | | GREENHORN | 7508 ft. | | | | | BENTONITE | 7714 ft. | | | | | D SAND | 7799 ft. | | | | | HUNTSMAN | 7821 ft. | | | | | J SAND | 7851 ft. | | | |
Formation JSND Formation Classification: OW Status: CM - 11/12/1987 Interval Top: 7882 ft. Interval Bottom: 7890 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/12/1987 | Choke Size: | 0.750 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/22/1988 | | Treatment Summary: | SEE SCANNED DOCUMENT #00394058 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7819 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/12/1987 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 31 | | CALC_BBLS_H2O | 31 | | CALC_MCF_GAS | 76 | | CASING_PRESS | 30 | | MCF_GAS | 76 |
| | Perforation Data: | | Interval Top: | 7882 ft. | # Of Holes: | 33 | | Interval Bottom: | 7890 ft. | Hole Size: | 0.41 in. |
|
Formation DSND Formation Classification: OW Status: PR - 5/1/2022 Interval Top: 7811 ft. Interval Bottom: 7821 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 6/8/1988 | Choke Size: | | | Formation Name: | D SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/22/1988 | | Treatment Summary: | SEE SCANNED DOCUMENT #00394058 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7741 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/22/1988 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 30 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 2267 | | CALC_MCF_GAS | 68 | | GRAVITY_OIL | 38 | | MCF_GAS | 68 |
| | Perforation Data: | | Interval Top: | 7811 ft. | # Of Holes: | 40 | | Interval Bottom: | 7821 ft. | Hole Size: | 0.47 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 848 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 2.327 |
| Average MCFE per Day | 13.497 |
| Federal Financial Assurance | i | |
|
|