|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2023 Measured TD: 8500 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2023 | Wellbore Permit | | Permit #: | 19840642 | Expiration Date: | 9/27/1984 | Proposed Depth/Form: | 8435 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 40, Drill Unit: SWNE |
| | |
Wellbore Completed | Completion Date: | 6/23/1984 | Spud Date: | 6/13/1984 | Spud Date Is: | ACTUAL | Measured TD: | 8500 ft. | Measured PB depth: | 8460 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | Radial CBL - 8/17/2021 | Log Types: | DENSILOG/NEUTRON/GR/CAL & DIFL/SFL/SP | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 310 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 0 ft., Bottom: 310 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8500 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 325, Top: 7145 ft., Bottom: 8500 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1999 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 1730 ft., Bottom: 2015 ft., Determination Method: CBL | Additional Cement: | String Type: S.C. 1.1 , Top: , Depth: 3164 ft., Bottom: , Sacks: 50, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7594 ft. | | | | FORT HAYS | 7901 ft. | | | | CARLILE | 7914 ft. | | | | GREENHORN | 7975 ft. | | | | GRANEROS | 8193 ft. | | | | D SAND | 8279 ft. | | | | HUNTSMAN | 8315 ft. | | | | J SAND | 8332 ft. | | | | SKULL CREEK | 8383 ft. | | | |
Formation DSND Formation Classification: OW Status: SI - 12/1/2024 Interval Top: 8283 ft. Interval Bottom: 8305 ft. Completed Information for Formation D SAND | 1st Production Date: | 8/1/1984 | Choke Size: | 0.000 in. | Formation Name: | D SAND | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 7/10/1984 | Treatment Summary: | SEE SCAN DOCUMENT # 441144 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8310 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/9/1984 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 116 | CALC_BBLS_OIL | 116 | CALC_GOR | 1595 | CALC_MCF_GAS | 185 | CASING_PRESS | 30 | MCF_GAS | 185 |
| Perforation Data: | Interval Top: | 8283 ft. | # Of Holes: | 26 | Interval Bottom: | 8305 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 180 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | BOE |
Average BOE per Day | 0.492 |
Average MCFE per Day | 2.853 |
Federal Financial Assurance | i | |
|
|