|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2025 Measured TD: 8500 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2025 | | Wellbore Permit | | | Permit #: | 19840642 | Expiration Date: | 9/27/1984 | | Proposed Depth/Form: | 8435 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 40, Drill Unit: SWNE |
| | |
| Wellbore Completed | | Completion Date: | 6/23/1984 | | Spud Date: | 6/13/1984 | Spud Date Is: | ACTUAL | | Measured TD: | 8500 ft. | Measured PB depth: | 8460 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Radial CBL - 8/17/2021 | | Log Types: | DENSILOG/NEUTRON/GR/CAL & DIFL/SFL/SP | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 310 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 310 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8500 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 7145 ft., Bottom: 8500 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1999 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 1730 ft., Bottom: 2015 ft., Determination Method: CBL | | Additional Cement: | String Type: S.C. 1.1 , Top: , Depth: 3164 ft., Bottom: , Sacks: 50, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7594 ft. | | | | | FORT HAYS | 7901 ft. | | | | | CARLILE | 7914 ft. | | | | | GREENHORN | 7975 ft. | | | | | GRANEROS | 8193 ft. | | | | | D SAND | 8279 ft. | | | | | HUNTSMAN | 8315 ft. | | | | | J SAND | 8332 ft. | | | | | SKULL CREEK | 8383 ft. | | | |
Formation DSND Formation Classification: OW Status: PR - 5/1/2025 Interval Top: 8283 ft. Interval Bottom: 8305 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 8/1/1984 | Choke Size: | 0.000 in. | | Formation Name: | D SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/10/1984 | | Treatment Summary: | SEE SCAN DOCUMENT # 441144 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8310 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/9/1984 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 116 | | CALC_BBLS_OIL | 116 | | CALC_GOR | 1595 | | CALC_MCF_GAS | 185 | | CASING_PRESS | 30 | | MCF_GAS | 185 |
| | Perforation Data: | | Interval Top: | 8283 ft. | # Of Holes: | 26 | | Interval Bottom: | 8305 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 145 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 0.396 |
| Average MCFE per Day | 2.292 |
| Federal Financial Assurance | i | |
|
|