|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 10/1/2017 Measured TD: 6303 ft. Vertical TD: 6303 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 10/1/2017 | | Wellbore Permit | | | Permit #: | 20064080 | Expiration Date: | 9/26/2007 | | Proposed Depth/Form: | 6303 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSCR , Formation: DESERT CREEK , Order: 0 , Unit Acreage: 160, Drill Unit: SE4 | | Formation And Spacing: | Code: HNKRT , Formation: HONAKER TRAIL , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 2022 ft., Weight: 32 , Citings Type: PLANNED | | Cement: | Sacks: 1090, Top: 0 ft., Bottom: 2022 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 6303 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 340, Top: 4800 ft., Bottom: 6303 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/21/1984 | | Spud Date: | 4/13/1984 | Spud Date Is: | ACTUAL | | Measured TD: | 6303 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | 6303 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2022 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 1090, Top: 0 ft., Bottom: 2022 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6303 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 340, Top: 4800 ft., Bottom: 6303 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | ISMAY | 5910 ft. | | | | | DESERT CREEK | 6160 ft. | | | |
Formation DSCR Formation Classification: GW Status: SI - 2/4/2015 Interval Top: 6215 ft. Interval Bottom: 6225 ft.| Completed Information for Formation DESERT CREEK | | 1st Production Date: | 5/20/1984 | Choke Size: | | | Formation Name: | DESERT CREEK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DSCR. |
| | Perforation Data: | | Interval Top: | 6215 ft. | # Of Holes: | | | Interval Bottom: | 6225 ft. | Hole Size: | |
|
Formation HNKRT Formation Classification: GW Status: SI - 8/1/2016 Interval Top: 5311 ft. Interval Bottom: 5454 ft.| Completed Information for Formation HONAKER TRAIL | | 1st Production Date: | 10/28/2006 | Choke Size: | | | Formation Name: | HONAKER TRAIL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/2/2006 | | Treatment Summary: | 500 GAL 15% HCC BREAKDOWN AND FRAC. W/15,000 GAL 2% KCL/N2 FOAM AND 35000# 20/40 SAND (5444-5454 WITH 40 PERFS). 750 GALS 15% SPEARHEAD ACID AND FRAC W/17,000 GAL 2% KCL/N2 FOAM AND 52500# 20/40 SAND (5311-5342 WITH 60 PERFS) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5280 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/28/2006 | Test Method: | FLOW | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 23 | | BBLS_OIL | 0 | | BTU_GAS | 898 | | CALC_BBLS_H2O | 23 | | CALC_MCF_GAS | 68 | | CASING_PRESS | 250 | | MCF_GAS | 68 | | TUBING_PRESS | 30 |
| | Perforation Data: | | Interval Top: | 5311 ft. | # Of Holes: | 100 | | Interval Bottom: | 5454 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 07/31/2016 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | Y |
|
|