|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: ERIW Status: PA - 10/24/2019 Measured TD: 8400 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: ERIW PA - 10/24/2019 | | Wellbore Permit | | | Permit #: | 19710979 | Expiration Date: | 12/7/1972 | | Proposed Depth/Form: | 8370 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: MDDYD , Formation: MUDDY D , Order: , Unit Acreage: 80, Drill Unit: N2SW |
| | |
| Wellbore Completed | | Completion Date: | 1/7/1972 | | Spud Date: | 12/14/1971 | Spud Date Is: | ACTUAL | | Measured TD: | 8400 ft. | Measured PB depth: | 8348 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES,DENSITY,SP | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 318 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 318 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8400 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 7700 ft., Bottom: 8400 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 800 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 266, Top: 0 ft., Bottom: 800 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1635 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 892 ft., Bottom: 1635 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | D SAND | 8230 ft. | | | | | J SAND | 8280 ft. | | | |
Formation JSND Formation Classification: ERIW Status: AB - 10/24/2019 Interval Top: 8287 ft. Interval Bottom: 8320 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 410 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 410 | | CALC_GOR | 2120 | | CALC_MCF_GAS | 870 | | CASING_PRESS | 725 | | MCF_GAS | 870 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 8287 ft. | # Of Holes: | 29 | | Interval Bottom: | 8320 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/24/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|