|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 10/24/2022 Measured TD: 8375 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 10/24/2022 | | Wellbore Permit | | | Permit #: | 19710886 | Expiration Date: | 11/10/1972 | | Proposed Depth/Form: | 8375 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 80, Drill Unit: E2NE |
| | |
| Wellbore Completed | | Completion Date: | 12/20/1971 | | Spud Date: | 11/22/1971 | Spud Date Is: | ACTUAL | | Measured TD: | 8375 ft. | Measured PB depth: | 8334 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES,FORM DENS. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 214 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 214 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8348 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 7670 ft., Bottom: 8348 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1653 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 1000 ft., Bottom: 1653 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | D SAND | 8200 ft. | | | | | J SAND | 8248 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/24/2022 Interval Top: 8264 ft. Interval Bottom: 8287 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/20/1971 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/20/1971 | | Treatment Summary: | 200 BBL Crude |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 8325 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/20/2019 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BBLS_OIL | 340 | | BTU_GAS | 1 | | CALC_BBLS_OIL | 340 | | CALC_GOR | 900 | | CALC_MCF_GAS | 306 | | CASING_PRESS | 180 | | GRAVITY_OIL | 40 | | MCF_GAS | 306 | | TUBING_PRESS | 150 |
| | Perforation Data: | | Interval Top: | 8264 ft. | # Of Holes: | 36 | | Interval Bottom: | 8287 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/24/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|