|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2023 Measured TD: 21697 ft. Vertical TD: 8361 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/11/2020 | Prop Depth/Form: | 21757 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-2222 , Unit Acreage: 1600, Drill Unit: 8 & 17: ALL, 20: N/2 | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21757 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2952, Top: 1500 ft., Bottom: 21757 ft. |
| | |
Wellbore Completed | Completion Date: | 10/29/2019 | Spud Date: | 6/14/2019 | Spud Date Is: | ACTUAL | Measured TD: | 21697 ft. | Measured PB depth: | 21684 ft. | True Vertical TD: | 8361 ft. | True Vertical PB depth: | 8361 ft. | Top PZ Location: | Sec:8 Twp: 1S 68W | Footage: 516 FNL 1172 FWL | Depth | Bottom Hole Location: | Sec:20 Twp: 1S 68W | Footage: 2140 FNL 1123 FWL | Depth | Log Types: | CBL, Mud Log, MWD/LWD, (Resistivity on 014-20753). | Log Types: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1650 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 525, Top: 0 ft., Bottom: 1652 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21684 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 3640, Top: 1070 ft., Bottom: 21697 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 1150 ft., Depth: 1160 ft., Bottom: 1160 ft., Sacks: 2, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 1240 ft., Depth: 1250 ft., Bottom: 1250 ft., Sacks: 2, Method: SQUEEZE | Additional Cement: | String Type: 1ST LINER , Top: 973 ft., Depth: , Bottom: 1170 ft., Sacks: , Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 5306 ft. | | N | N | SUSSEX | 5730 ft. | | N | N | SHANNON | 6380 ft. | | N | N | SHARON SPRINGS | 8827 ft. | | N | N | NIOBRARA | 8840 ft. | | N | N | FORT HAYS | 9438 ft. | | N | N | CODELL | 9770 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: CM - 5/18/2020 Interval Top: 14496 ft. Interval Bottom: 21657 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/21/2020 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/30/2020 | Treatment End Date: | 2/11/2020 | Treatment Summary: | Producing Intervals: 14496'-14773'; 21654'-21657'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 14496 ft. | # Of Holes: | 37 | Interval Bottom: | 21657 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 5/18/2020 Interval Top: 9787 ft. Interval Bottom: 21512 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/21/2020 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/30/2020 | Treatment End Date: | 2/11/2020 | Treatment Summary: | Perforated Intervals: 9787'-10666'; 10796'-14241'; 15505'-20095'; 20346'-21512'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 9787 ft. | # Of Holes: | 1215 | Interval Bottom: | 21512 ft. | Hole Size: | 0.38 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 5/18/2020 Interval Top: 9535 ft. Interval Bottom: 21608 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | 4/21/2020 | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/30/2020 | Treatment End Date: | 2/11/2020 | Treatment Summary: | Perforated Intervals: 9535'-9753'; 10689'-10752'; 14268'-14473'; 14797'-15482'; 20129'-20323'; 21535'-21608'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 9535 ft. | # Of Holes: | 189 | Interval Bottom: | 21608 ft. | Hole Size: | 0.38 in. |
|
Formation NBFHC Formation Classification: OW Status: PR - 8/1/2023 Interval Top: 9535 ft. Interval Bottom: 21657 ft. Completed Information for Formation NIOBRARA-FT HAYS-CODELL | 1st Production Date: | 4/21/2020 | Choke Size: | | Formation Name: | NIOBRARA-FT HAYS-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/30/2020 | Treatment End Date: | 2/11/2020 | Treatment Summary: | Frac'd Niobrara-Fort Hays-Codell with a 49-stage plug-and-perf;
192490 total bbls fluid pumped: 168852 bbls gelled fluid and 23638 bbls fresh water (no acid);
9187780 total lbs proppant pumped: all 30/50 mesh sand. | Total fluid used in treatment (bbls): | 192490 | Max pressure during treatment (psi): | 9750 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 49 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.81 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 24960 | Fresh water used in treatment (bbls): | 23638 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 9187780 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9495 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/27/2020 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 172 | BBLS_OIL | 646 | BTU_GAS | 1390 | CALC_BBLS_H2O | 172 | CALC_BBLS_OIL | 646 | CALC_GOR | 2392 | CALC_MCF_GAS | 1545 | CASING_PRESS | 2861 | GRAVITY_OIL | 52 | MCF_GAS | 1545 | TUBING_PRESS | 2524 |
| Perforation Data: | Interval Top: | 9535 ft. | # Of Holes: | 1441 | Interval Bottom: | 21657 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 29024 |
Total Gas Produced (MCF) | 216330 |
GOR | 7453 |
GOR Determination | BOE |
Average BOE per Day | 181.209 |
Average MCFE per Day | 1051.021 |
Federal Financial Assurance | i | |
|
|