Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20799
Well Classification: OW Status: PR - 8/1/2023
Well Name/No:Livingston #S20-25-4N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2023
FacilityID:457255LocationID:455317
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NESE 7 1S68W 6
Field:WATTENBERG - #90750Elevation:5330 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2330FSL  1222 FELLat/Long: 39.978560 / -105.039030Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.978561 / -105.039030Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/31/2020
End Date: 2/13/2020
Reported: 2/28/2020
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 21585 ft.    Vertical TD: 8103 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/11/2020
Proposed Top PZ Location:Sec:8 Twp: 1S 68W Footage: 480 FNL  888 FWL
Bottom Hole Location:Sec:20 Twp: 1S 68W Footage: 2186 FNL  842 FWL
Proposed Depth/Form:21546 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2222 , Unit Acreage: 1600, Drill Unit: 8 & 17: ALL, 20: N/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21546 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2921, Top: 1500 ft., Bottom: 21546 ft.

Wellbore Completed
Completion Date:10/18/2019
Spud Date:6/14/2019Spud Date Is:ACTUAL
Measured TD:21585 ft.Measured PB depth:21554 ft.
True Vertical TD:8103 ft.True Vertical PB depth:8104 ft.
Top PZ Location:Sec:8 Twp: 1S 68WFootage: 516 FNL  899 FWL
Bottom Hole Location:Sec:20 Twp: 1S 68WFootage: 2141 FNL  851 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Resistivity on 014-20753).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1648 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1653 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21571 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3405, Top: 210 ft., Bottom: 21585 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5322 ft.NN
SUSSEX5813 ft.NN
SHANNON6453 ft.NN
SHARON SPRINGS8960 ft.NN
NIOBRARA8983 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2023                  Interval Top: 9420 ft.    Interval Bottom: 21542 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/20/2020Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/31/2020Treatment End Date:2/13/2020
Treatment Summary:Frac'd Niobrara with 61-stage plug-and-perf; 297200 total bbls fluid pumped: 268171 bbls gelled fluid and 29029 bbls fresh water (no acid); 12200130 total lbs proppant pumped: all 40/70 mesh.
Total fluid used in treatment (bbls):297200Max pressure during treatment (psi):8424
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:61
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):18204
Fresh water used in treatment (bbls):29029Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12200130Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9410 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/27/2020Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 432
BBLS_OIL 631
BTU_GAS 1390
CALC_BBLS_H2O 432
CALC_BBLS_OIL 631
CALC_GOR 1891
CALC_MCF_GAS 1193
CASING_PRESS 2561
GRAVITY_OIL 52
MCF_GAS 1193
TUBING_PRESS 2034
Perforation Data:
Interval Top:9420 ft.# Of Holes:1441
Interval Bottom:21542 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)8593
Total Gas Produced (MCF)162144
GOR18869
GOR DeterminationMCFE
Average BOE per Day100.151
Average MCFE per Day580.904

 Federal Financial Assurance  i 

 Tribal Well  i No