Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20778
Well Classification: OW Status: PR - 11/1/2022
Well Name/No:INTERCHANGE B #S22-30-19C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2022
FacilityID:456758LocationID:456747
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NESW 10 1S68W 6
Field:WATTENBERG - #90750Elevation:5206 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2218FSL  1758 FWLLat/Long: 39.978209 / -104.990908Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.978205 / -104.990903Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/16/2022
End Date: 7/2/2022
Reported: 7/13/2022
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2022             Measured TD: 25107 ft.    Vertical TD: 8129 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/22/2020
Proposed Top PZ Location:Sec:10 Twp: 1S 68W Footage: 150 FNL  240 FEL
Bottom Hole Location:Sec:22 Twp: 1S 68W Footage: 460 FSL  191 FEL
Proposed Depth/Form:25236 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2222 , Unit Acreage: 1920, Drill Unit: S.10, 15 & 22 - ALL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 25236 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3459, Top: 1500 ft., Bottom: 25236 ft.

Wellbore Completed
Completion Date:5/27/2022
Spud Date:9/15/2019Spud Date Is:ACTUAL
Measured TD:25107 ft.Measured PB depth:25090 ft.
True Vertical TD:8129 ft.True Vertical PB depth:8129 ft.
Top PZ Location:Sec:10 Twp: 1S 68WFootage: 229 FNL  224 FEL
Bottom Hole Location:Sec:22 Twp: 1S 68WFootage: 460 FSL  198 FEL
Log Types:No logs to upload.
Log Types:CBL, MWD/LWD, (Resistivity on 014-20850).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1671 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1671 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 25095 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 4025, Top: 1585 ft., Bottom: 25095 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5223 ft.NN
SUSSEX5818 ft.NN
SHANNON6250 ft.NN
SHARON SPRINGS9079 ft.NN
NIOBRARA9127 ft.NN
FORT HAYS9903 ft.NN
CODELL10266 ft.NN
CARLILE12246 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 11/15/2022                Interval Top: 12246 ft.    Interval Bottom: 15201 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/8/2022Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/16/2022Treatment End Date:7/2/2022
Treatment Summary:Perforated Intervals: 12246'-12331'; 14327'-14383'; 14464'-14868'; 14923'-15201'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12246 ft.# Of Holes:162
Interval Bottom:15201 ft.Hole Size:0.26 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/15/2022                Interval Top: 10266 ft.    Interval Bottom: 25038 ft.

 Completed Information for Formation CODELL
1st Production Date:9/8/2022Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/16/2022Treatment End Date:7/2/2022
Treatment Summary:Perforated Intervals: 10266'-11029'; 11273'-12245'; 12347'-14309'; 14400'-14455'; 14886'-14906'; 15223'-16394'; 17028'-17504'; 17787'-25038'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:10266 ft.# Of Holes:2230
Interval Bottom:25038 ft.Hole Size:0.26 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 9/20/2022                 Interval Top: 9920 ft.    Interval Bottom: 25038 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:9/8/2022Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/16/2022Treatment End Date:7/2/2022
Treatment Summary:Frac'd Carlile-Codell-Fort Hays with a 60 stage plug and perf; 357620 total bbls fluid pumped: 321851 bbls gelled fluid and 35769 bbls fresh water; 9517220 total lbs proppant pumped: 6655180 lbs 40/70 mesh and 2862040 lbs 30/50 mesh.
Total fluid used in treatment (bbls):357620Max pressure during treatment (psi):8590
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:60
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):35769Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9517220Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9846 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/20/2022Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 50
BBLS_OIL 292
BTU_GAS 1340
CALC_BBLS_H2O 50
CALC_BBLS_OIL 292
CALC_GOR 1651
CALC_MCF_GAS 482
CASING_PRESS 2875
GRAVITY_OIL 50
MCF_GAS 482
TUBING_PRESS 2521
Perforation Data:
Interval Top:9920 ft.# Of Holes:2640
Interval Bottom:25038 ft.Hole Size:0.26 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/15/2022                Interval Top: 9920 ft.    Interval Bottom: 17763 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/8/2022Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/16/2022Treatment End Date:7/2/2022
Treatment Summary:Perforated Intervals: 9920'-10245'; 11046'-11253'; 16416'-17011'; 17531'-17763'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9920 ft.# Of Holes:248
Interval Bottom:17763 ft.Hole Size:0.26 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)47375
Total Gas Produced (MCF)533043
GOR11251
GOR DeterminationBOE
Average BOE per Day381.764
Average MCFE per Day2214.229

 Federal Financial Assurance  i 

 Tribal Well  i No