Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20754
Well Classification: OW Status: PR - 8/1/2023
Well Name/No:Livingston #S19-25-8C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2023
FacilityID:455312LocationID:455317
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NWSE 7 1S68W 6
Field:WATTENBERG - #90750Elevation:5321 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2331FSL  1402 FELLat/Long: 39.978562 / -105.039672Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.978563 / -105.039673Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/3/2019
End Date: 12/18/2019
Reported: 1/13/2020
Days to report: 26
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 21183 ft.    Vertical TD: 8409 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/31/2020
Proposed Top PZ Location:Sec:7 Twp: 1S 68W Footage: 2385 FSL  2456 FEL
Bottom Hole Location:Sec:19 Twp: 1S 68W Footage: 509 FSL  2542 FEL
Proposed Depth/Form:21271 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2274 , Unit Acreage: 1600, Drill Unit: 7: S/2, 18 & 19: ALL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21271 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2881, Top: 1500 ft., Bottom: 21271 ft.

Wellbore Completed
Completion Date:8/28/2019
Spud Date:6/8/2019Spud Date Is:ACTUAL
Measured TD:21183 ft.Measured PB depth:21158 ft.
True Vertical TD:8409 ft.True Vertical PB depth:8408 ft.
Top PZ Location:Sec:7 Twp: 1S 68WFootage: 2385 FSL  2456 FEL
Bottom Hole Location:Sec:19 Twp: 1S 68WFootage: 509 FSL  2542 FEL
Log Types:CBL, Mud Log, MWD/LWD, (Resistivity on 014-20753).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1620 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1622 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21173 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3586, Top: 2750 ft., Bottom: 21183 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4690 ft.NN
SUSSEX5065 ft.NN
SHANNON5590 ft.NN
NIOBRARA7982 ft.NN
FORT HAYS8629 ft.NN
CODELL8702 ft.NN
CARLILE10258 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 10265 ft.    Interval Bottom: 14814 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/17/2020Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/3/2019Treatment End Date:12/18/2019
Treatment Summary:Perforated Intervals: 10265'-10328'; 14392'-14814'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10265 ft.# Of Holes:60
Interval Bottom:14814 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/18/2020                 Interval Top: 9419 ft.    Interval Bottom: 21146 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/17/2020Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/3/2019Treatment End Date:12/18/2019
Treatment Summary:Perforated Intervals: 9419'-9788'; 13495'-13779'; 16451'-16615'; 18726'-18777'; 19405'-19451'; 19500'-19546'; 20764'-21146'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9419 ft.# Of Holes:172
Interval Bottom:21146 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 9370 ft.    Interval Bottom: 9395 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/17/2020Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/3/2019Treatment End Date:12/18/2019
Treatment Summary:Perforated Interval: 9370'-9395'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:9370 ft.# Of Holes:6
Interval Bottom:9395 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 8756 ft.    Interval Bottom: 20740 ft.

 Completed Information for Formation CODELL
1st Production Date:4/17/2020Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/3/2019Treatment End Date:12/18/2019
Treatment Summary:Perforated Intervals: 8756'-9346'; 9812'-10243'; 10352'-13472'; 13803'-14369'; 14834'-16431'; 16639'-18702'; 18811'-19377'; 19475'-19476'; 19585'-20740'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8756 ft.# Of Holes:1203
Interval Bottom:20740 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 8/1/2023                  Interval Top: 8756 ft.    Interval Bottom: 21146 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:4/17/2020Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/3/2019Treatment End Date:12/18/2019
Treatment Summary:Frac'd Niobrara-Fort Hays-Codell-Carlile with a 49-stage plug-and-perf; 183862 total bbls fluid pumped: 165146 bbls gelled fluid and 18716 bbls fresh water (no acid); 9187895 total lbs proppant pumped: all 30/50 mesh sand.
Total fluid used in treatment (bbls):183862Max pressure during treatment (psi):8413
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):17059
Fresh water used in treatment (bbls):18716Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9187895Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8723 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/27/2020Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 326
BBLS_OIL 583
BTU_GAS 1390
CALC_BBLS_H2O 326
CALC_BBLS_OIL 583
CALC_GOR 2717
CALC_MCF_GAS 1584
CASING_PRESS 3040
GRAVITY_OIL 52
MCF_GAS 1584
TUBING_PRESS 2641
Perforation Data:
Interval Top:8756 ft.# Of Holes:1441
Interval Bottom:21146 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)14832
Total Gas Produced (MCF)162331
GOR10944
GOR DeterminationBOE
Average BOE per Day117.325
Average MCFE per Day680.489

 Federal Financial Assurance  i 

 Tribal Well  i No