|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 6/21/2023 Measured TD: 8980 ft. Vertical TD: 8609 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 6/21/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/22/2012 | | Proposed Top PZ Location: | Sec:26 Twp: 1N 68W | Footage: 121 FSL 31 FWL | | Bottom Hole Location: | Sec:26 Twp: 1N 68W | Footage: 141 FSL 52 FWL | | Proposed Depth/Form: | 8930 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1040 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 1040 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8930 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 7694 ft., Bottom: 8930 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/9/2011 | | Spud Date: | 10/4/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8980 ft. | Measured PB depth: | 8938 ft. | | True Vertical TD: | 8609 ft. | True Vertical PB depth: | 8567 ft. | | Top PZ Location: | Sec:26 Twp: 1N 68W | Footage: 121 FSL 31 FWL | | Bottom Hole Location: | Sec:26 Twp: 1N 68W | Footage: 141 FSL 52 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1061 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 1061 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8967 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 3870 ft., Bottom: 8967 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 5222 ft. | | | | | NIOBRARA | 7985 ft. | | | | | CODELL | 8411 ft. | | | | | J SAND | 8848 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 6/21/2023 Interval Top: 8861 ft. Interval Bottom: 8878 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/13/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/22/2011 | | Treatment Summary: | Frac'd the J-Sand 8861’– 8878’, (34 holes) w/ 62,580 gal 18 # Vistar
Hybrid cross linked gel containing 249,980# 20/40 Sand. 11-22-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8861 ft. | # Of Holes: | 34 | | Interval Bottom: | 8878 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 6/21/2023 Interval Top: 8411 ft. Interval Bottom: 8424 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/13/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/22/2011 | | Treatment Summary: | Set CFP @ 8460'. 11-22-11
Frac'd the Codell 8411’ – 8424’, (26 holes) w/ 88,410 gal 22 # Vistar Hybrid
cross linked gel containing 251,600 # 30/50 sand. 11-22-11
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8411 ft. | # Of Holes: | 26 | | Interval Bottom: | 8424 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/21/2023 Interval Top: 7992 ft. Interval Bottom: 8878 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/13/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/14/2012 | | Treatment Summary: | Set CBP @ 7940'. 02-10-12. Drilled out CBP @ 7940', CFP @ 8250, 8460' to commingle the JSND-NBRR-CDL.
02-11-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8825 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/14/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 130 | | BBLS_OIL | 96 | | BTU_GAS | 1344 | | CALC_BBLS_H2O | 130 | | CALC_BBLS_OIL | 96 | | CALC_GOR | 4563 | | CALC_MCF_GAS | 438 | | CASING_PRESS | 2165 | | GRAVITY_OIL | 48 | | MCF_GAS | 438 | | TUBING_PRESS | 1140 |
| | Perforation Data: | | Interval Top: | 7992 ft. | # Of Holes: | 236 | | Interval Bottom: | 8878 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/21/2023 Interval Top: 7992 ft. Interval Bottom: 8424 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/13/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7992 ft. | # Of Holes: | 202 | | Interval Bottom: | 8424 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/21/2023 Interval Top: 7992 ft. Interval Bottom: 8210 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/13/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/22/2011 | | Treatment Summary: | Set CFP @ 8250'. 11-22-11
Frac'd the Niobrara 7992’ – 8210’ (176 holes), w/ 99,708 gals 18 # Vistar
Hybrid cross linked gel containing 250,020# 30/50 sand. 11-22-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7992 ft. | # Of Holes: | 176 | | Interval Bottom: | 8210 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/21/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|