|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/1/2025 Measured TD: 8845 ft. Vertical TD: 8575 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/22/2012 | | Proposed Top PZ Location: | Sec:26 Twp: 1N 68W | Footage: 1350 FSL 2575 FWL | | Bottom Hole Location: | Sec:26 Twp: 1N 68W | Footage: 1350 FSL 2575 FWL | | Proposed Depth/Form: | 8832 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2-26 T1N-68W | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S/2-26 T1N-68W | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2-26 T1N-68W | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1040 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 1040 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8832 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 7594 ft., Bottom: 8832 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/29/2011 | | Spud Date: | 10/24/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8845 ft. | Measured PB depth: | 8814 ft. | | True Vertical TD: | 8575 ft. | True Vertical PB depth: | 8544 ft. | | Top PZ Location: | Sec:26 Twp: 1N 68W | Footage: 1394 FSL 2565 FWL | | Bottom Hole Location: | Sec:26 Twp: 1N 68W | Footage: 1404 FSL 2595 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1084 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1084 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8831 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 705, Top: 3637 ft., Bottom: 8831 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 5182 ft. | | | | | NIOBRARA | 7898 ft. | | | | | CODELL | 8334 ft. | | | | | J SAND | 8772 ft. | | | |
Formation JSND Formation Classification: Status: PR - 10/1/2025 Interval Top: 8786 ft. Interval Bottom: 8806 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/5/2011 | | Treatment Summary: | Frac'd the J-Sand 8786’– 8806’, (40 holes) w/ 60,732 gal 18 # Vistar Hybrid cross linked gel containing 235,393# 20/40 Sand. 12-05-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8786 ft. | # Of Holes: | 40 | | Interval Bottom: | 8806 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: Status: CM - 3/27/2012 Interval Top: 8334 ft. Interval Bottom: 8354 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/6/2011 | | Treatment Summary: | Set CFP @ 8420'. 12-05-11
Frac'd the Codell 8334’ – 8354’, (40 holes) w/ 90,762 gal 22 # Vistar Hybrid
cross linked gel containing 250,200 # 30/50 sand. 12-06-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8334 ft. | # Of Holes: | 40 | | Interval Bottom: | 8354 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 2/9/2012 Interval Top: 7903 ft. Interval Bottom: 8806 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/9/2012 | | Treatment Summary: | Set CBP @ 7850'. 02-01-12
Drilled out CBP @ 7850', CFP @ 8170', CFP @ 8420' to commingle the JSND-NBRR-CDL. 02-02-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8775 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/9/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 96 | | BBLS_OIL | 58 | | BTU_GAS | 1350 | | CALC_BBLS_H2O | 96 | | CALC_BBLS_OIL | 58 | | CALC_GOR | 3707 | | CALC_MCF_GAS | 215 | | CASING_PRESS | 1508 | | GRAVITY_OIL | 50 | | MCF_GAS | 215 | | TUBING_PRESS | 310 |
| | Perforation Data: | | Interval Top: | 7903 ft. | # Of Holes: | 236 | | Interval Bottom: | 8806 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: Status: PR - 10/1/2025 Interval Top: 7903 ft. Interval Bottom: 8354 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7903 ft. | # Of Holes: | 196 | | Interval Bottom: | 8354 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 3/27/2012 Interval Top: 7903 ft. Interval Bottom: 8108 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/7/2011 | | Treatment Summary: | Set CFP @ 8170'. 12-07-11
Frac'd the Niobrara 7903’ – 8108’ (156 holes), w/ 108,948 gals 18 # Vistar
Hybrid cross linked gel containing 250,200# 30/50 sand. 12-07-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7903 ft. | # Of Holes: | 156 | | Interval Bottom: | 8108 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 126 |
| Total Gas Produced (MCF) | 600 |
| GOR | 4761 |
| GOR Determination | BOE |
| Average BOE per Day | 1.080 |
| Average MCFE per Day | 6.272 |
| Federal Financial Assurance | i | |
|
|